Baise Smelter power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Baise Smelter power station (百矿集团煤电铝一体化项目自备电厂) is an operating power station of at least 700-megawatts (MW) in Toutang Town, Tianyang, Baise, Guangxi, China. It is also known as 百矿发电公司.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Baise Smelter power station Toutang Town, Tianyang, Baise, Guangxi, China 23.78636, 106.8202 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 23.78636, 106.8202

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 Operating coal: unknown 350 supercritical 2015
Unit 2 Operating coal: unknown 350 supercritical 2015

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Baise Baikuang Power Generation Co Ltd [100%] Geely Group Co Ltd [33.5%]; Ningbo Ruima Enterprise Management Partnership LP [32.2%]; Guangxi Baise Industrial Investment Development Group Co Ltd [25.0%]; Hangzhou Kunyu Enterprise Management Partnership LP [4.1%]; Hangzhou Huiren Youren Enterprise Management Partnership LP [2.0%]; Hangzhou Huiren Youzhi Enterprise Management Partnership LP [2.0%]; unknown [0.7%]; Hangzhou Huiren Youyi Enterprise Management Partnership LP [0.6%]
Unit 2 Baise Baikuang Power Generation Co Ltd [100%] Geely Group Co Ltd [33.5%]; Ningbo Ruima Enterprise Management Partnership LP [32.2%]; Guangxi Baise Industrial Investment Development Group Co Ltd [25.0%]; Hangzhou Kunyu Enterprise Management Partnership LP [4.1%]; Hangzhou Huiren Youren Enterprise Management Partnership LP [2.0%]; Hangzhou Huiren Youzhi Enterprise Management Partnership LP [2.0%]; unknown [0.7%]; Hangzhou Huiren Youyi Enterprise Management Partnership LP [0.6%]

Project-level captive use details

  • Captive industry use (heat or power): power
  • Captive industry: Aluminum


Background on Project

Guangxi Baise Mining Group is planning to build a two-unit coal-fired captive power plant with a total planned capacity of 700 MW in Guangxi Zhuang Autonomous Region. The contract for the plant's construction was awarded to the China Energy Engineering Corporation in 2013.[1]

The two units are planned for operation in September and December 2015.[2]

The plant was commissioned in 2015.[3]

Articles and Resources

References

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.