Baiyanghe coal mine
This article is part of the CoalSwarm coverage of China and coal |
Sub-articles: |
Baiyanghe coal mine (新疆明基能源有限公司白杨河矿井) The construction site is located in Hutubi County, Changji Hui Autonomous Prefecture, Xinjiang Uygur Autonomous Region, the total mine production capacity is 5 million tons/year, of which the first phase construction scale is 1.2 million tons/year and second phase is 5 million tons per year.[1] [2]
Location
The undated satellite photo below shows the coal mine located in Queergou Town, Hutubi County, Changji Hui Autonomous Prefecture, Xinjiang Uygur Autonomous Region, China.
Coal Mine Background
On September 9, 2020, the National Energy Administration approved the first phase of the Baiyanghe Mine Project in the Baiyanghe Mining Area, Changji, Xinjiang. The total production capacity of the first phase is 1.2 million tons/year, and the total capacity of the whole mine is 5 million tons/year. [1]
Project Details
- Sponsor: Xinjiang Mingji Energy Co., Ltd.[1]
- Parent Company: Shandong Lutai Holding Group Co., Ltd. (75%), Ming Kei Energy Investment Co., Ltd. (25%)[3]
- Location: Queergou Town, Hutubi County, Changji Hui Autonomous Prefecture, Xinjiang Uygur Autonomous Region, China.[1]
- GPS Coordinates: 44.048539,88.529268
- Status: Proposed [1]
- Production Capacity: 5Mt/year[1] 1.2Mt/year (Phase 1), 3.8 Mt/year (Phase 2)
- Workforce Size: <50[3]
- Coal Field:
- Total Resource: 1074Mt[2]
- Mineable Reserves: 508Mt[2]
- Coal Type:
- Mine Size: 20.5675k㎡[4]
- Mine Type: Underground[1]
- Start Year:
- Source of Financing:
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "国家能源局关于新疆昌吉白杨河矿区白杨河矿井一期工程项目核准的批复",国家能源局, 检索日期:2020/10/4
- ↑ 2.0 2.1 2.2 "山东鲁泰控股集团有限公司 新疆白杨河煤矿(筹建处)公开选聘中层管理人员公告", 山东鲁泰控股集团有限公司,检索日期:2020/10/4
- ↑ 3.0 3.1 "新疆明基能源有限公司",企查查,检索日期:2020/10/4
- ↑ "2015年2季度--新疆自治区呼图壁白杨河矿区白杨河煤矿安全预评价报告", 中煤科工集团重庆研究院有限公司,检索日期:2020/10/4