Bakeoven Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Bakeoven Solar is a solar farm under construction in Maupin, Wasco County, Oregon, United States.
Project Details
Table 1: Phase-level project details for Bakeoven Solar
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Construction[1] | 2022 (planned)[2] | 60 MWac[2] | PV[2] | Avangrid Renewables[1] | Avangrid Renewables[2] |
Read more about solar capacity ratings.
Location
Table 2: Phase-level location details for Bakeoven Solar
Location | Coordinates (WGS 84) |
---|---|
Maupin, Wasco County, Oregon, United States[3] | 45.1318, -120.8807 (exact)[2] |
The map below shows the exact location of the solar farm:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "Bakeoven Solar Project". Oregon. Archived from the original on January 20, 2022. Retrieved February 14, 2022.
- ↑ 2.0 2.1 2.2 2.3 2.4 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022.
{{cite web}}
: Check date values in:|archive-date=
(help) - ↑ "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.