Bakeoven Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Bakeoven Solar is a solar photovoltaic (PV) farm under construction in Maupin, Wasco County, Oregon, United States.
Project Details
Table 1: Phase-level project details for Bakeoven Solar
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Construction[1] | 2024 (planned)[2] | 60 MWac[3] | PV[3] | Avangrid Renewables[1] | Avangrid Renewables[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Bakeoven Solar
Location | Coordinates (WGS 84) |
---|---|
Maupin, Wasco County, Oregon, United States[4] | 45.1318, -120.8807 (exact)[3] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.oregon.gov/energy/facilities-safety/facilities/Pages/BSP.aspx.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.intel.com/content/www/us/en/newsroom/article/helping-power-oregon-solar-future.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022.
{{cite web}}
: Check date values in:|archive-date=
(help) - ↑ "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.