Balrampur Coal Mine

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Balrampur Coal Mine is an operating coal mine in Balrampur, Surajpur, Chhattisgarh, India.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Balrampur Coal Mine Balrampur, Surajpur, Chhattisgarh, India[1] 23.229703, 83.010222 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating – – –

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
0.6[2] 0.119[1] 2024[1] Underground[1] Bord and Pillar[2] 5.5[2] 300* 690.6050422*

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
6.5 – 12.1 Bisrampur Subbituminous Thermal –

Table 5: Ownership and parent company

Note: To access more comprehensive data on energy ownership, please visit the Global Energy Ownership Tracker.
Owner Parent Company Headquarters
South Eastern Coalfields Ltd [100.0%] Coal India India

Table 6: Historical production (unit: million tonnes per annum)

ROM or Saleable 2017 2018 2019 2020 2021 2022 2023 2024 2025
– – – – – 0.04[3] 0.1[3] – 0.12[1] –

Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on Mine

The Balrampur Underground Coal Mine Project has a designed capacity 0.84 million tonnes per annum. It is located on a mining lease area of 555.0 ha in Bisrampur coal block. The project received environment clearance on 23 April 1998.[4] However, the project needs new environment clearance as per the revised guidelines of the MoEF&CC, India.[5]

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 https://coalcontroller.gov.in/mine-statistics. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 (PDF) https://www.secl-cil.in/writereaddata/Balrampur.pdf. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 (PDF) https://coal.nic.in/sites/default/files/2023-05/23-05-2023.pdf. {{cite web}}: Missing or empty |title= (help)
  4. ↑ EC for expnsion of Balrampur underground coal mine project, MoEF&CC India, 23 April 1998
  5. ↑ Minutes of 38th EAC meeting, MoEF&CC India, 27 September 2018