Bangka-1A power station is a cancelled power station in Air Anyir, Sumatera, Indonesia.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Bangka-1A power station | Air Anyir, Sumatera, Indonesia | -2.079245, 106.149617 (approximate) |
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Cancelled | coal: unknown | 50 | unknown | 2022 | False |
| Unit 2 | Cancelled | coal: unknown | 50 | unknown | 2023 | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | PT PLN (Persero) [100%] | PT PLN (Persero) [100.0%] |
| Unit 2 | PT PLN (Persero) [100%] | PT PLN (Persero) [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The plant was proposed in the PLN 2019-2028 long-range plan.[1]
In August 2019, PLN Persero announced that it was acquiring land for the project and planned to commission it within three years.[2]
In the RUPTL for 2021-2030, the project appeared to have been replaced with non-coal alternatives.[3]
Articles and Resources
References
- ↑ Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2019-2028, PT PLN Persero, A-57
- ↑ PLN Babel va construi 2x50 MW PLTU, Bangkapos.com, Aug. 23, 2019
- ↑ Rencana Usaha Penyediaan Tenaga Listrik (RUPTL), PLN Persero, October 2021
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.