Banyeres–Tamarite Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Banyeres–Tamarite Gas Pipeline is an operating gas pipeline in Spain.[1]

Location

The pipeline starts in Baneras, Spain, and runs to Pinasses, Spain.[2][3]

Loading map...

Project Details

  • Operator: Enagás, S.A.
  • Owner: Enagás, S.A.[4]
  • Parent Company: Enagás, S.A.[5]
  • Capacity:
  • Length: 68.3 km / 42.5 mi[6]
  • Diameter:
  • Status: Operating[1]
  • Start Year:
  • SciGrid pipeline name(s): Baneras_Pinasses[1]

Resources and articles

References

  1. 1.0 1.1 1.2 Diettrich, J.C.; Pluta, A.; Medrjoubi, W. (July 23, 2020). "The combined IGG gas transmission network data set". SciGRID_gas. Retrieved September 2, 2020.{{cite web}}: CS1 maint: url-status (link)
  2. Enagas. "Transmission, storage and regasification services and infrastructure" (PDF). Enagas.es. Retrieved January 22, 2021.{{cite web}}: CS1 maint: url-status (link)
  3. Spain’s gas demand grows 11.6% in May, driven by industry, Gas to Power Journal, 1 June 2018 (accessed Jan 28, 2021)
  4. "The Spanish Gas System" (PDF). Enagas. 2021. Retrieved Aug 8th, 2022. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  5. Enagás. "Gas Pipelines - Energy Infrastructure - Enagás". www.enagas.es. Retrieved 2022-08-08.
  6. TYNDP 2020 - MAP – Transmission, ENTSOG, October 2020; length calculated by Global Energy Monitor