Baoding Northwest Suburb power station (深能保定发电厂) is an operating power station of at least 700-megawatts (MW) in Yaozhuang, Mancheng, Baoding, Hebei, China with multiple units, some of which are not currently operating. It is also known as 深能保定西北郊热电厂二期 (Phase II Unit 3), 深能保定西北郊热电项目 (Unit 1, Unit 2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Baoding Northwest Suburb power station Yaozhuang, Mancheng, Baoding, Hebei, China 38.961835, 115.36719 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase II Unit 3, Unit 1, Unit 2: 38.961835, 115.36719

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase II Unit 3 permitted coal - unknown 660 ultra-supercritical 2025[1]
Unit 1 operating coal - unknown 350 supercritical 2017
Unit 2 operating coal - unknown 350 supercritical 2018

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase II Unit 3 Shenneng Baoding Power Generation Co Ltd [100.0%]
Unit 1 Shenneng Baoding Power Generation Co Ltd [100.0%]
Unit 2 Shenneng Baoding Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): March 7, 2023 – 冀发改能源核字〔2023〕16 号[1], September 29, 2015

Background

Shenzhen Energy has proposed a supercritical coal-fired co-generation power station of 700 MW for Yaozhuang in Mancheng District, Baoding. It is planned to supply heat in winter to Baoding City and be completed in 2017.[2][3]

The plant was permitted in 2015 and was under construction in 2016.[4]

2017: Expansion postponed by government

In July 2017, the NEA released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[5]

Baoding Northwest Suburb power station Units 1-2 were among the postponed coal-burning units.[6]

September 2017: Suspension lifted on unit 1, continued on unit 2

After political negotiations, China's National Energy Administration (NEA) released an updated list of postponed and halted coal projects on September 26, 2017. The new list contained 151 units totaling 95 gigawatts (GW). Baoding Northwest Suburb power station Unit 1 was no longer on the list, while Unit 2 was, meaning only unit 2 is postponed.[7] For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.

Unit 1 began operating on December 31, 2017.[8]

Construction continues on Unit 2

Satellite photos for September 2017 and March 2018 show construction continuing on Unit 2.

Unit 2 was commissioned in September 2018.[9]

Phase II

In February 2023, an environmental impact assessment notice was released for a 660 MW Phase II of Baoding Northwest Suburb power station.[10]

In March 2023, Phase II was permitted.[11] China Power Construction Hebei Institute won the bid for survey and design of the expansion. The new unit would use ultra-supercritical technology.[12]

In April 2023, the land acquisition process for Unit 3 was announced.[13]

In May 2023, bidding was underway for equipment procurement.[14]

Articles and Resources

References

  1. 1.0 1.1 https://web.archive.org/web/20240125143041/https://www.sec.com.cn/biddingShow.do?id=64499. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. "深能保定西北郊热电厂一期2×35万千瓦项目," 2015-05-08
  3. "深能保定西北郊热电厂一期2×350MW工程可研审查会在保定召开," 保定公司 作者, 2015-05-08
  4. "深圳能源集团股份有限公司关于投资建设保定西北郊热电厂一期2×35万千瓦超临界燃煤机组项目的公告," Sina, June 14, 2016
  5. "16部委联合发文防范化解煤电产能过剩风险," Sohu.com, 2017-08-03
  6. "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
  7. "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
  8. "深能保定西北郊热电厂1号机组顺利通过168小时试运行," 深圳能源, 2018/1/3
  9. "深能保定西北郊热电厂2号机组通过168小时试运行," 中国电建, 2018/9/27
  10. "深能保定西北郊热电厂二期项目环评公众参与第一次信息公示," sec.com, 2023-02-14
  11. 深能保定西北郊热电厂二期项目环境影响报告书第三次公示, 深圳能源集团股份有限公司, November 9, 2023
  12. "1×660MW!中国电建河北院中标大容量、高参数超超临界燃煤机组项目勘察设计," news.bjx.com, 2023-03-06
  13. "保定满城区要庄乡要庄村征收土地预公告 涉及深能保定西北郊热电厂二期项目," sohu.com, 2023-04-14
  14. "深能集团1×660MW燃煤机组三大主机采购," mp.weixin.qq.com, 2023-05-09