Baoding Northwest Suburb power station (深能保定发电厂) is an operating power station of at least 700-megawatts (MW) in Yaozhuang, Mancheng, Baoding, Hebei, China with multiple units, some of which are not currently operating. It is also known as 深能保定西北郊热电厂二期 (Phase II Unit 3), 深能保定西北郊热电项目 (Unit 1, Unit 2).
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Baoding Northwest Suburb power station | Yaozhuang, Mancheng, Baoding, Hebei, China | 38.961835, 115.36719 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase II Unit 3, Unit 1, Unit 2: 38.961835, 115.36719
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Phase II Unit 3 | Construction[2][3] | coal: unknown[4][1] | 660[1] | ultra-supercritical[1] | yes[1] | 2025 (planned)[1] | False |
| Unit 1 | Operating | coal: unknown[4] | 350 | supercritical | yes | 2017 | False |
| Unit 2 | Operating | coal: unknown[4] | 350 | supercritical | yes | 2018 | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase II Unit 3 | Shenneng Baoding Power Generation Co Ltd [100%][1] | Shenzhen Energy Group Co Ltd [100.0%] |
| Unit 1 | Shenneng Baoding Power Generation Co Ltd [100%][1] | Shenzhen Energy Group Co Ltd [100.0%] |
| Unit 2 | Shenneng Baoding Power Generation Co Ltd [100%][1] | Shenzhen Energy Group Co Ltd [100.0%] |
Project-level coal details
- Coal source(s): domestic/imported
- Permit(s): 冀发改能源核字〔2023〕16 号[1]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Shenzhen Energy has proposed a supercritical coal-fired co-generation power station of 700 MW for Yaozhuang in Mancheng District, Baoding. It is planned to supply heat in winter to Baoding City and be completed in 2017.[5][6]
The plant was permitted in 2015 and was under construction in 2016.[7]
2017: Expansion postponed by government
In July 2017, the NEA released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[8]
Baoding Northwest Suburb power station Units 1-2 were among the postponed coal-burning units.[9]
September 2017: Suspension lifted on unit 1, continued on unit 2
After political negotiations, China's National Energy Administration (NEA) released an updated list of postponed and halted coal projects on September 26, 2017. The new list contained 151 units totaling 95 gigawatts (GW). Baoding Northwest Suburb power station Unit 1 was no longer on the list, while Unit 2 was, meaning only unit 2 is postponed.[10] For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.
Unit 1 began operating on December 31, 2017.[11]
Construction continues on Unit 2
Satellite photos for September 2017 and March 2018 show construction continuing on Unit 2.
Unit 2 was commissioned in September 2018.[12]
Phase II
In February 2023, an environmental impact assessment notice was released for a 660 MW Phase II of Baoding Northwest Suburb power station.[13]
In March 2023, Phase II was permitted.[14] China Power Construction Hebei Institute won the bid for survey and design of the expansion. The new unit would use ultra-supercritical technology.[15]
In April 2023, the land acquisition process for Unit 3 was announced.[16]
In May 2023, bidding was underway for equipment procurement.[17]
In September 2023, Shanghai Electric won the bid for the main equipment.[18] Shenzhen Energy announced in December 2023 that its subsidiary would invest in the project.[19]
The project received EIA approval in January 2024.[20] In March 2024, China Energy Engineering Group Tianjin Electric Power Construction Co. won the bid for the main construction contract,[21] and on March 30, 2024, the first concrete pour for the boiler foundation marked the start of main construction.[22]
Construction milestones included completion of the chimney base in April 2024,[23] boiler steel structure lifting in June 2024,[24] and boiler plate beam lifting in December 2024.[25]
The project was listed on Hebei's 2024 key projects list.[26]
Construction continued through 2025 and into 2026, with cooling tower completion in July 2025,[27] boiler hydrostatic test in September 2025,[28] and turbine cover completion in December 2025.[29]
As of May 20, 2026, the unit had not yet entered operation.[30]
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 "能源集团". www.sec.com.cn. 2023-11-09. Archived from the original on 2024-01-25. Retrieved 2023-11-30.
- ↑ "深圳能源又一大型煤电项目,开工". stock.10jqka.com.cn. 2024-04-01. Archived from the original on 2024-04-09. Retrieved 2024-04-04.
- ↑ "深圳能源又一大型煤电项目,开工!-北极星火力发电网". news.bjx.com.cn. 2024-04-02. Archived from the original on 2024-04-09. Retrieved 2024-04-04.
- ↑ 4.0 4.1 4.2 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ "深能保定西北郊热电厂一期2×35万千瓦项目," 2015-05-08
- ↑ "深能保定西北郊热电厂一期2×350MW工程可研审查会在保定召开," 保定公司 作者, 2015-05-08
- ↑ "深圳能源集团股份有限公司关于投资建设保定西北郊热电厂一期2×35万千瓦超临界燃煤机组项目的公告," Sina, June 14, 2016
- ↑ "16部委联合发文防范化解煤电产能过剩风险," Sohu.com, 2017-08-03
- ↑ "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
- ↑ "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
- ↑ "深能保定西北郊热电厂1号机组顺利通过168小时试运行," 深圳能源, 2018/1/3
- ↑ "深能保定西北郊热电厂2号机组通过168小时试运行," 中国电建, 2018/9/27
- ↑ "深能保定西北郊热电厂二期项目环评公众参与第一次信息公示," sec.com, 2023-02-14
- ↑ 深能保定西北郊热电厂二期项目环境影响报告书第三次公示, 深圳能源集团股份有限公司, November 9, 2023
- ↑ "1×660MW!中国电建河北院中标大容量、高参数超超临界燃煤机组项目勘察设计," news.bjx.com, 2023-03-06
- ↑ "保定满城区要庄乡要庄村征收土地预公告 涉及深能保定西北郊热电厂二期项目," sohu.com, 2023-04-14
- ↑ "深能集团1×660MW燃煤机组三大主机采购," mp.weixin.qq.com, 2023-05-09
- ↑ "上海电气中标深能保定西北郊热电二期1×660MW燃煤机组三大主机设备". 微信公众号. 2023-09-27. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "深圳能源拟投资建设深能保定西北郊热电厂二期项目". 北极星电力网. 2023-12-19. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "深能保定西北郊热电厂1×660MW二期项目率先取得环评批复". 北极星电力网. 2024-01-10. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中国能建天津电建中标深能保定西北郊热电厂二期项目主体建安工程". 微信公众号. 2024-03-15. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "深能保定西北郊热电厂二期项目成功举行"锅炉基础浇筑"启动仪式". 微信公众号. 2024-03-30. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "深能保定西北郊热电厂二期项目66万千瓦机组烟囱基础浇筑顺利完成". 北极星电力网. 2024-04-29. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "深能保定西北郊热电厂二期项目锅炉本体第一榀钢结构顺利起吊". 北极星电力网. 2024-06-21. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "深能保定电厂二期1×66万千瓦热电联产项目锅炉大板梁顺利开吊". 北极星电力网. 2024-12-13. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "河北省2024年省重点建设项目名单". 北极星电力网. 2024-04-02. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "深能保定西北郊热电厂二期项目三号冷却塔结顶". 微信公众号. 2025-07-16. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "保定二期1×660兆瓦燃煤机组3号锅炉水压试验一次成功". 微信公众号. 2025-09-20. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "保定公司二期66万千瓦超超临界热电联产项目汽轮机扣盖作业一次成功". 微信公众号. 2025-12-16. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link) - ↑ "深能保定发电有限公司开展技能比武活动". 微信公众号. 2026-05-20. Retrieved 2026-06-12.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.