Inner Mongolia BaoTou Steel Union Co.,Ltd. plant

From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor.
Sub-articles:

Inner Mongolia BaoTou Steel Union Co.,Ltd. plant (内蒙古包钢钢联股份有限公司) is an integrated steel plant in Baotou, Inner Mongolia Autonomous Region, China.[1]

Location

The map below shows the location of the steel plant in Baotou, Inner Mongolia Autonomous Region, China.

Loading map...

Background

According to the announcement of the capacity replacement plan, the company plans to build a 100-tonne basic oxygen furnace and a 100-tonne electric arc furnace. The basic oxygen furnace is expected to be put into operation in 2022 and the electric arc furnace will be put into operation in 2023.[2]

Plant Details

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 公司简介, 内蒙古包钢钢联股份有限公司官网, Accessed September 2021
  2. 包钢集团钢铁产能置换方案公示,内蒙古自治区工业和信息化厅,November 23, 2021
  3. 3.0 3.1 3.2 3.3 3.4 3.5 内蒙古包钢钢联股份有限公司, 企查查, Accessed September 2021
  4. 4.0 4.1 4.2 "内蒙古包钢钢联股份有限公司2020年公开发行公司债券(第二期)募集说明书摘要",内蒙古包钢钢联股份有限公司,July 2020
  5. 5.0 5.1 全国规范钢铁企业拟增至263家(附全名单及其装备), 我的钢铁网, March 2, 2020
  6. 包钢集团产能置换评估意见,冶金工业规划研究院,November 15, 2021

External resources


External articles