Baraúnas 4 wind farm (Parque Eólico Baraúnas 4) is a wind farm under construction in Juazeiro, Região Administrativa Integrada de Desenvolvimento do Polo Petrolina e Juazeiro, Região Geográfica Intermediária de Juazeiro, Bahia, Brazil.


Project Details

Table 1: Phase-level project details for Baraúnas 4 wind farm

Phase name Status Commissioning year Nameplate capacity Mount type Owner Operator
4 Construction[1][2] 2022 (planned)[1] 42[3][2] Onshore Brennand Energia[1][2] Baraúnas IV Energética SA[3]


Location

Table 2: Phase-level location details for Baraúnas 4 wind farm

Phase name Location Coordinates (WGS 84)
4 Juazeiro, Região Administrativa Integrada de Desenvolvimento do Polo Petrolina e Juazeiro, Região Geográfica Intermediária de Juazeiro, Bahia, Brazil[3] -9.8837, -40.4164 (exact)[3]

The map below shows the exact location of the wind farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 Olivieri, Giuliana (January 7, 2021). "Brennand Investe Na Construção De Parques De Energia Renováveis Na Ba". Canal Solar. Archived from the original on September 10, 2021. Retrieved November 17, 2021.
  2. 2.0 2.1 2.2 "Brennand Energia". Brennandenergia. Archived from the original on September 10, 2021. Retrieved November 17, 2021.
  3. 3.0 3.1 3.2 3.3 "Informações De Geração - Aneel". Aneel. Retrieved November 17, 2021. {{cite web}}: |archive-url= requires |archive-date= (help)