Baraiyarhat solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: 50 MW Grid-tied Solar Power Plant

Baraiyarhat solar farm is a solar farm in pre-construction in Chattogram District, Chattogram Division, Bangladesh.


Project Details

Table 1: Phase-level project details for Baraiyarhat solar farm

Status Commissioning year Nameplate capacity Technology
Pre-construction[1] 2023 (planned)[1] 50 MWp/dc[1] PV[1]

Read more about solar capacity ratings.


Location

Table 2: Phase-level location details for Baraiyarhat solar farm

Location Coordinates (WGS 84)
Chattogram District, Chattogram Division, Bangladesh[1] 22.8926, 91.5339 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "ndre.sreda.gov.bd/index.php?id=06&kid=4169". Archived from the original on January 10, 2022. Retrieved January 18, 2022.