Barkol Santang Lake Industrial Park Chahaquan Heat Island cogen power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Barkol Santang Lake Industrial Park Chahaquan Heat Island cogen power station (巴里坤三塘湖工业园区岔哈泉区公用热岛热电联产项目) is a permitted power station in Barkol Kazakh Autonomous County, Hami Prefecture, Xinjiang, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Barkol Santang Lake Industrial Park Chahaquan Heat Island cogen power station | Barkol Kazakh Autonomous County, Hami Prefecture, Xinjiang, China | 44.026883, 93.863984 (approximate)[1] |
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Permitted[1] | coal: unknown[1] | 30[1] | subcritical[1] | yes[1] | False |
| Unit 2 | Permitted[1] | coal: unknown[1] | 30[1] | unknown[1] | yes[1] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Management Committee of Santanghu Industrial Park, Barkol Kazakh Autonomous County [100%] | Management Committee of Santanghu Industrial Park, Barkol Kazakh Autonomous County [100.0%] |
| Unit 2 | Management Committee of Santanghu Industrial Park, Barkol Kazakh Autonomous County [100%] | Management Committee of Santanghu Industrial Park, Barkol Kazakh Autonomous County [100.0%] |
Project-level captive use details
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Management Committee of the Santang Lake Industrial Park in Barkol Kazakh Autonomous County has commissioned Xinjiang Grunte Environmental Technology Co., Ltd. to conduct an environmental impact assessment for the combined heat and power project in the Chahaquan area, slated for 2024-2030, with the report ready for submission to the regional ecological environment department [2]. Public participation information for the project's social stability risk analysis was released on March 15, 2025, detailing its location near existing infrastructure in Hami City [3]. An environmental impact report draft was made public on April 23, 2025, and the regional ecological environment department acknowledged receipt of the evaluation documents on April 25, 2025 [4]. On July 7, 2025, the department announced a decision regarding the environmental impact assessment for the project [5].
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 https://sthjt.xinjiang.gov.cn/xjepd/sthjt_hjyxpj/202507/aef872dcbb234c0eb7285e2711bdb07f.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "新疆哈密巴里坤县岔哈泉区热电联产规划(2024-2030年)环境影响评价公众参与拟报批公示 生态环境保护产业协会". www.xjhbcy.cn (in 中文(中国大陆)). Retrieved 2025-09-15.
- ↑ "巴里坤三塘湖工业园区岔哈泉区公用热岛热电联产项目社会稳定风险分析公众参与信息公示_重大项目和公共资源配置_巴里坤哈萨克自治县人民政府". www.xjblk.gov.cn. Retrieved 2025-09-15.
- ↑ "新疆维吾尔自治区生态环境厅环境影响评价与排放管理处关于2025年4月25日建设项目环境影响评价文件受理情况的公示_项目受理公示_新疆维吾尔自治区生态环境厅". sthjt.xinjiang.gov.cn. Retrieved 2025-09-15.
- ↑ "新疆维吾尔自治区生态环境厅环境影响评价与排放管理处关于2025年7月7日拟作出的建设项目环境影响评价文件批复决定的公示_环境影响评价_新疆维吾尔自治区生态环境厅". sthjt.xinjiang.gov.cn. Retrieved 2025-09-15.
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.
