Barlovento offshore wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Barlovento offshore wind farm (Parque Eólico Marino Barlovento) is an announced wind farm in Uribia, La Guajira, Colombia.

Project Details

Table 1: Phase-level project details for Barlovento offshore wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
0 Announced[1] 2032 (planned)[2] 825 MW[2] Offshore mount unknown[1] Bluefloat Energy[3] OWF Barlovento[1]

Location

Table 2: Phase-level location details for Barlovento offshore wind farm

Phase Name Location Coordinates (WGS 84)
0 Uribia, La Guajira, Colombia[2] 11.9129, -72.4082 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 https://web.archive.org/web/20240125171501/http://www.siel.gov.co/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 "Inscripción de proyectos de generación". SIEL. 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-09.
  3. ↑ (PDF) https://web.archive.org/web/20240314010417/https://indepaz.org.co/wp-content/uploads/2023/07/publicacion-indepaz-web-final.pdf. Archived from the original (PDF) on 2024-03-14. {{cite web}}: Missing or empty |title= (help)