Barzasskoye Tovarischestvo Coal Mine

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Barzasskoye Tovarischestvo Coal Mine (Разрез Барзасское товарищество,разрез Барзасский) is an operating coal mine in Berezovsky, Kemerovsky, Kemerovo, Russia.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Barzasskoye Tovarischestvo Coal Mine Berezovsky, Kemerovsky, Kemerovo, Russia[1] 55.72548139, 86.01755391 (exact)

The map below shows the exact location of the coal mine:


Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating[2] – 2006[3] –

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
2.8[4] 3.2[5] 2023[5] Surface Open Pit – 60* 629.9190925*

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
– – – Glushinsky Bituminous[6] Thermal & Met[6] –

Table 5: Ownership and parent company

Note: To access more comprehensive data on energy ownership, please visit the Global Energy Ownership Tracker.
Owner Parent Company Headquarters
Barzasskoye Tovarishestvo LLC [100.0%][7] Stroyservis JSC Russia

Table 6: Historical production (unit: million tonnes per annum)

Note: The asterisk (*) indicates that the value is an estimated figure based on various factors, including the company's forecasted or reported monthly or quarterly production data, etc.
ROM or Saleable 2017 2018 2019 2020 2021 2022 2023 2024 2025
Saleable 1.3[8] 1.76[8] 2.21[9] 2.82[10] 2.9[11] 2.67*[12] 3.2*[5] – –


Expansion/Extension

Table 7: Project status

* Added capacity of a coal mine refers to the enhancement in the mine's production capabilities beyond its initial production capacity.
Status Status Detail Project Type Project Phase Added Capacity (Mtpa)* Start Year
Proposed[13] Pre-Permit[13] Expansion – 0.9[14] 2025

Note: The above sections were automatically generated and are based on data from the Global Coal Mine Tracker August 2026 release.

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The Barzasskoye tovarischestvo coal mine (разрез Барзасское товарищество) is an operating surface mine in the Kemerovo Oblast in Russia. The Barzasskoye tovarishestvo coal mine is owned and operated by Barzasskoe Tovarischestvo LLC, which in turn is owned by Stroyservis JSC.[15]

The Barzasskoye tovarischestvo coal mine is the youngest mine of the company. It was put into operation in 2006 at the sites of the Glushinsky coal deposit.[16]

The company produces coal of coking and energy grades KS, KO, SS (Bituminous). There is a processing plant of its own with an annual processing capacity of 2.5 million tonnes of coal per year.[16]

In the 10 months of 2022, the mine produced 2.225 million tonnes of coal.[17] In May 2022, there was a fatality at the mine when a truck fell in the pit.[18]

All coal mines owned by Stroyservis decreased 2023 production by about 7% to 16.3 million tonnes.[19] However, the Barzasskoye tovarishestvo appeared to have increased production. The mine was reported to have produced 2.55 million tonnes of coking coal.[19] Assuming the same share of coking vs thermal coal as in 2022 (78% vs 22%), total 2023 coal production of the mine was estimated at 3.2 million tonnes.

According to industry-wide statistics, coal production at Barzasskoye Tovarischestvo amounted to 1.22 million tonnes in the first half of 2024.[20]

Expansion

In addition to the existing mine, two expansion projects were considered: Gusinsky-South and Shcherbinovsky. They were mentioned in Russia's 'Programme for Coal Industry Development up to 2035', released in June 2020.[21]

Gusinsky-South was planned to be commissioned in the first quarter of 2020.[21] It appeared that it was commissioned as planned in late 2019/2020 as Stroyservis has been reporting environmental indicators and explosion activity separately for this section of the mine.[22]

As for Scherbinovsky, in its press release from December 2021 the company mentioned the plan to produce a total of 4.1 million tonnes in 2022, including an additional 0.9 million tonnes from Scherbinovsky.[23] However as of September 2023 it appeared that this section was not yet producing as there was no explosion activity or environmental indicators reported for this section of the mine during 2022 or 2023.[22] Actual 2022 production also fell short of the previous expectation and was around 2.7 million tonnes.[17]

The technical documentation for the public discussion of Scherbinovsky section was published in August 2024 (without underlying documentation), with the plan to conduct environmental assessment of the expansion from June to November 2024.[24] It therefore appeared that the expansion project was still being developed.

This is further supported by the fact that the development of the Scherbinovsky section was reviewed on 20 November 2025 as part of the Schedule for the review of mining development plans for 2026 for enterprises engaged in open-pit mining in the Kemerovo, Novosibirsk, Tomsk and Omsk regions, indicating that the project remained under regulatory consideration.[25]

Related GEM.wiki articles

Coal Mine Boundaries and Methane Sources

Global Energy Monitor researchers have identified coal mine boundary/boundaries and potential sources of coal mine methane (CMM) for this mine. These research results can be used to drive CMM attribution and mitigation efforts, particularly when combined with remotely sensed methane plume locations and mine ownership data. Explore the results with the embedded map at the top of this page by clicking on the mine boundary polygon or the CMM placemarkers to reveal more details. A detailed description of this research can be found in Coal Mine Boundaries and Methane Sources. This data is also available as a downloadable companion dataset to the Global Coal Mine Tracker and the Global Methane Emitters Tracker.

Table SMP1: Coal mine boundaries and methane sources data

ID Mine feature category Mine feature subcategory Description Coordinates precision Data source date
M0773.B1 mine boundary surface Barzasskoye tovarischestvo coal mine boundary extracted 2025-12-17 00:00:00

Table SMP2: Coal mine boundaries and methane sources data (continued)

Coal mine boundaries and methane sources were last researched for this mine on Dec 17, 2025
ID Notes
M0773.B1 This mine operates under the Barzasskoye tovarischestvo subsoil land-use license КЕМ01345ТЭ, as identified through the website of the Russian Federal Geological Fund (Российский федеральный геологический фонд), rosgeolfond.ru/storage/dokumenty/5GR%20UGOL%2015.06.2018.xls?ysclid=mj943rsyiw463095669, 2018. The license was issued on December 26, 2007, and is valid until December 31, 2027. The boundary was extracted from the NedraExpert portal at https://web.archive.org/web/20251217152249/https://www.nedraexpert.ru/license/150214?ysclid=mj947mtec7135488394.The approximate area of the resulting boundary is 8 square km.

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. ↑ https://web.archive.org/web/20240121033008/https://www.mining-portal.ru/companies/stroyservis/barzasskoe-tovarischestvo/. Archived from the original on 21 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. ↑ https://zarya42.ru/news/aktualno/glava-okruga-vstretilsya-s-nbsp-direktorom-ugolnogo-razreza. {{cite web}}: Missing or empty |title= (help)
  3. ↑ https://web.archive.org/web/20240715233032/https://stroyservis.com/about/companies/detail/3. {{cite web}}: Missing or empty |title= (help)
  4. ↑ https://energybase.ru/coal-mine/bazrasskoye-tovarishchestvo-open-pit-mine. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 5.2 (PDF) http://www.eruda.ru/files/itogi_raboty_ugolnoy_promyshlennosti_2023_top_predpriyatiy_itogi-raboty-ugolnoy-promyshlennosti-rossii-za-2023-god.pdf. {{cite web}}: Missing or empty |title= (help)
  6. ↑ 6.0 6.1 https://stroyservis.com/en/about/companies/detail/3/. {{cite web}}: Missing or empty |title= (help)
  7. ↑ https://web.archive.org/web/20240125065626/https://stroyservis.com/about/companies. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  8. ↑ 8.0 8.1 https://cyberleninka.ru/article/n/itogi-raboty-ugolnoy-promyshlennosti-rossii-za-yanvar-dekabr-2018-goda/viewer. {{cite web}}: Missing or empty |title= (help)
  9. ↑ https://cyberleninka.ru/article/n/itogi-raboty-ugolnoy-promyshlennosti-rossii-za-yanvar-dekabr-2019-goda/viewer. {{cite web}}: Missing or empty |title= (help)
  10. ↑ https://cyberleninka.ru/article/n/itogi-raboty-ugolnoy-promyshlennosti-rossii-za-yanvar-dekabr-2020-goda/viewer. {{cite web}}: Missing or empty |title= (help)
  11. ↑ https://stroyservis.com/about/companies/detail/3. {{cite web}}: Missing or empty |title= (help)
  12. ↑ https://energyland.info/analitic-show-235919. {{cite web}}: Missing or empty |title= (help)
  13. ↑ 13.0 13.1 http://usib.gosnadzor.ru/activity/PRGR/%D0%93%D1%80%D0%B0%D1%84%D0%B8%D0%BA_%D0%9F%D0%A0%D0%93%D0%A0_2026_%D0%9A%D0%A2%D0%9E%D0%9E%D0%93%D0%A0.doc. {{cite web}}: Missing or empty |title= (help)
  14. ↑ https://stroyservis.com/presscenter/news/detail/1947/. {{cite web}}: Missing or empty |title= (help)
  15. ↑ "Предприятия". stroyservis.com. unknown. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  16. ↑ 16.0 16.1 Stroyservis. "About Company". Retrieved September 2022. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  17. ↑ 17.0 17.1 "«Стройсервис» за 10 месяцев 2022 года добыл 13,3 млн тонн угля". /energyland.info. November 2022.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "Сотрудник угольного разреза в Кемеровском районе погиб в результате ЧП". vse42.ru. 12 May 2022.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ 19.0 19.1 "26.04.2024 Журнал "Уголь" опубликовал итоги работы угольной промышленности РФ за 2023 г." /www.eruda.ru/. April 2024.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ Мешков, Г.Б.; Петренко, И.Е.; Губанов, Д.А. (2024). "Итоги работы угольной промышленности России за январь–июнь 2024 года". Уголь (in русский). 9: 5–16. Retrieved February 9, 2026.
  21. ↑ 21.0 21.1 "Программа Развития Угольной промышленности до 2035 года". government.ru. 13 June 2020.{{cite web}}: CS1 maint: url-status (link)
  22. ↑ 22.0 22.1 Stroyservis. "Охрана окружающей среды". Retrieved September 2022 and September 2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  23. ↑ Stroyservis (24 December 2021). "Горняки «Барзасского товарищества» досрочно выполнили годовой план угледобычи". Retrieved September 2022. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  24. ↑ "Технический проект разработки Анжерского каменноугольного месторождения в границах Южного блока участка Щербиновский". https://o-v-o-s.ru/client. August 2024. {{cite web}}: External link in |website= (help)CS1 maint: url-status (link)
  25. ↑ "График рассмотрения планов развития горных работ на 2026 год по предприятиям, осуществляющим разработку месторождений полезных ископаемых открытым способом на территориях Кемеровской, Новосибирской, Томской и Омской областей". Сибирское управление Ростехнадзора (in Russian). Retrieved February 9, 2026.{{cite web}}: CS1 maint: unrecognized language (link)