Batangas Combined Cycle power plant

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Batangas Combined Cycle power plant is an operating power station of at least 875-megawatts (MW) in Batangas, Calabarzon, Philippines with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Batangas Combined Cycle power plant Batangas, Batangas, Calabarzon, Philippines 13.622, 121.0795 (exact)[1][2][3]
Loading map...

Unit-level coordinates (WGS 84):

  • 1-1, 1-2, 1-3, 2-1: 13.622, 121.0795

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1-1 Operating[4][5][6][7][8][9][10][11][12][13][14] fossil gas: LNG[12][15] 437.5[4][14] combined cycle[1] not found 2025[16][13][17][4]
1-2 Operating[4][5][6][7][8][9][10][11][12][13][14] fossil gas: LNG[12][15] 437.5[4][14] combined cycle[1] not found 2025[16][13][4]
1-3 Construction[5][6][13][7][8][9][10][11][12][18][19][4][14] fossil gas: LNG[12][15] 437.5[4][14] combined cycle[1] not found 2025 (planned)[16][13][4]
2-1 Announced[5][6][7][8][9][20][12][4][14] fossil gas: LNG[12][15] 437.5[4][14] combined cycle[1] not found

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1-1 Excellent Energy Resources Inc [100%][16][21][22] Manila Electric Co [40.2%]; San Miguel Corp [33.0%]; Therma NatGas Power Inc [26.8%]
1-2 Excellent Energy Resources Inc [100%][16][21][22] Manila Electric Co [40.2%]; San Miguel Corp [33.0%]; Therma NatGas Power Inc [26.8%]
1-3 Excellent Energy Resources Inc [100%][16][21][22] Manila Electric Co [40.2%]; San Miguel Corp [33.0%]; Therma NatGas Power Inc [26.8%]
2-1 Excellent Energy Resources Inc [100%][16][21][22] Manila Electric Co [40.2%]; San Miguel Corp [33.0%]; Therma NatGas Power Inc [26.8%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 (PDF) https://web.archive.org/web/20220810052034/https://eia.emb.gov.ph/wp-content/uploads/2021/01/2021.01.04.PJ_.EERI_.Draft-EISR_with-AI-inputs_v2.pdf. Archived from the original (PDF) on 2022-08-10. {{cite web}}: Missing or empty |title= (help)
  2. https://www.google.com/maps/place/Ilijan+Power+Plant/@13.6221415,121.0767363,1086m/data=!3m1!1e3!4m5!3m4!1s0x33bd02b350f9ba61:0xb1189e1767a67865!8m2!3d13.6221362!4d121.0789248. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20210622211044/http://powerphilippines.com/san-miguel-building-more-lng-power-plants/. Archived from the original on 2021-06-22. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 (PDF) https://web.archive.org/web/20221224013712/http://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_committed_2020_december.pdf. Archived from the original (PDF) on 2022-12-24. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 (PDF) https://web.archive.org/web/20230506214727/http://www.doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon%20Committed%20-%202023-03-31.pdf. Archived from the original (PDF) on 2023-05-06. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 https://gastopowerjournal.com/itemlist/tag/Batangas. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 (PDF) https://web.archive.org/web/20220810052034/https://eia.emb.gov.ph/wp-content/uploads/2021/01/2021.01.04.PJ_.EERI_.Draft-EISR_with-AI-inputs_v2.pdf. Archived from the original (PDF) on 2022-08-10. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 https://web.archive.org/web/20221108122241/https://www.manilatimes.net/2022/10/27/opinion/columns/ph-needs-to-put-the-brakes-on-the-gas/1863872. Archived from the original on 2022-11-08. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 https://smcglobalpower.com.ph/our-business-power-generation?slug=batangas-lng-fired-power-plant&p=4. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 https://web.archive.org/web/20230818101344/https://powerphilippines.com/san-miguel-plants-may-begin-operations-by-2024/. Archived from the original on 2023-08-18. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 https://web.archive.org/web/20230705124837/https://smcglobalpower.com.ph/our-business-power-generation?slug=batangas-lng-fired-power-plant&p=4. Archived from the original on 2023-07-05. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 12.4 12.5 12.6 12.7 https://web.archive.org/web/20220809232322/https://www.power-technology.com/marketdata/barangays-de-la-paz-proper-combined-cycle-power-plant-philippines/. Archived from the original on 2022-08-09. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 13.5 https://manilastandard.net/business/314580351/eeri-vows-to-resolve-batangas-natural-gas-plant-issues.html. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 14.5 14.6 14.7 (PDF) https://web.archive.org/web/20221221061706/http://www.doe.gov.ph/sites/default/files/pdf/electric_power/01-luzon_committed_lopsipp_31-august-202.pdf. Archived from the original (PDF) on 2022-12-21. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 https://web.archive.org/web/20220819143040/https://www.bworldonline.com/editors-picks/2021/02/15/344852/3-gas-fired-power-plants-seen-launching-between-2022-2025/. Archived from the original on 2022-08-19. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 16.2 16.3 16.4 16.5 16.6 (PDF) https://web.archive.org/web/20221224013737/http://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_indicative_2020_october.pdf. Archived from the original (PDF) on 2022-12-24. {{cite web}}: Missing or empty |title= (help)
  17. (PDF) https://legacy.doe.gov.ph/sites/default/files/pdf/electric_power/01_%20Luzon%20Grid.pdf. {{cite web}}: Missing or empty |title= (help)
  18. https://www.iemop.ph/the-market/participants/wesm-members/. {{cite web}}: Missing or empty |title= (help)
  19. https://www.instagram.com/p/DMFwnAvO8nD/. {{cite web}}: Missing or empty |title= (help)
  20. (PDF) https://web.archive.org/web/20231004133449/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/private_sector_initiated_power_projects/01_Luzon-Committed-July-2023.pdf. Archived from the original (PDF) on 2023-10-04. {{cite web}}: Missing or empty |title= (help)
  21. 21.0 21.1 21.2 21.3 (PDF) https://web.archive.org/web/20240612170622/https://www.pds.com.ph/wp-content/uploads/2024/03/Disclosure-No.-783-2024-Material-InformationTransactionsCorporate-Actions.pdf. Archived from the original (PDF) on 2024-06-12. {{cite web}}: Missing or empty |title= (help)
  22. 22.0 22.1 22.2 22.3 (PDF) https://web.archive.org/web/20240612170551/https://ieefa.org/sites/default/files/2023-09/IEEFA%2520Report%2520-%2520San%2520Miguel%2520Global%2520Power_09.2023.pdf. Archived from the original (PDF) on 2024-06-12. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.