Battambang solar farm is an operating solar farm in Anlong Run, Thma Koul, Battambang, Cambodia.


Project Details

The solar farm has one phase that is at least 20 MW. (Read more about solar capacity ratings.)

Table 1: Phase-level project details for Battambang solar farm

Status Commissioning year Nameplate capacity Owner Operator
Operating[1] 2021[1] 60 MW[2] Total Eren[3] Risen Energy Company Limited[3]

Location

Table 2: Phase-level location details for Battambang solar farm

Location Coordinates (WGS 84)
Anlong Run, Thma Koul, Battambang, Cambodia[4][5][1] 13.2601, 103.0876 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 Vireak, Thou. "60Mw Solar Station In Battambang Hooked To Grid". The Phnom Penh Post. Archived from the original on January 23, 2022. Retrieved February 14, 2022.
  2. "Clean Energy Map". Clean Energy Cambodia. Archived from the original on December 17, 2021. Retrieved February 14, 2022.
  3. 3.0 3.1 https://web.archive.org/web/20211106144349/https://renewablesnow.com/news/total-eren-buys-74-mwp-solar-farm-in-cambodia-from-risen-energy-759863/. Missing or empty |title= (help)
  4. "B.Grimm To Acquire 30-Mw Solar Pv Project In Cambodia". Renewables Now. November 20, 2019. Archived from the original on January 4, 2022. Retrieved February 14, 2022.
  5. Chikkodi, Ashwini (March 23, 2021). "Cambodia'S Three Solar Power Stations Ready To Connect To Grid". Solar Quarter. Archived from the original on January 24, 2022. Retrieved February 14, 2022.