Battle Born Solar Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Battle Born Solar Project is a cancelled solar farm in Las Vegas, Mormon Mesa, Nevada, United States.


Project Details

Table 1: Phase-level project details for Battle Born Solar Project

Status Nameplate capacity Technology Owner
Cancelled[1] 850 MW[1] PV[1] Arevia Power[1][2]

Read more about solar capacity ratings.


Location

Table 2: Phase-level location details for Battle Born Solar Project

Location Coordinates (WGS 84)
Las Vegas, Mormon Mesa, Nevada, United States[1][2] 36.5122, -114.3760 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 "Facing Opposition, Developers Pull Application For 850 Mw Solar Project In The Nevada Desert". Pv Magazine Usa. July 26, 2021. Archived from the original on February 8, 2022. Retrieved February 14, 2022.
  2. 2.0 2.1 2.2 "'Our Mesa': Saved!". The Progress. July 28, 2021. Archived from the original on September 26, 2021. Retrieved February 14, 2022.