Battle Mountain Solar Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Battle Mountain Solar Project is an operating solar photovoltaic (PV) farm in Battle Mountain, Humboldt County, Nevada, United States.

Project Details

Table 1: Phase-level project details for Battle Mountain Solar Project

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2021[1] 101 MWac[2] PV[2] NV Energy[3] Consolidated Edison Development INC[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Battle Mountain Solar Project

Location Coordinates (WGS 84)
Battle Mountain, Humboldt County, Nevada, United States[4] 40.7184, -117.0614 (exact)[2]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.nnbw.com/news/2021/aug/26/120-million-solar-project-operation-rural-northern/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022. {{cite web}}: Check date values in: |archive-date= (help)
  3. https://www.power-technology.com/marketdata/battle-mountain-solar-project-battery-energy-storage-system-us/. {{cite web}}: Missing or empty |title= (help)
  4. "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.