Beijing–Shijiazhuang–Handan Parallel Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Beijing–Shijiazhuang–Handan Parallel Gas Pipeline 京石邯输气管道复线 is a pipeline under construction in China.[1]

Location

The pipeline starts at the same location as the Beijing–Shijiazhuang–Handan Gas Pipeline and ends in Qingyuan County, Baoding, Hebei Province.

Loading map...

Project details

  • Owner: Hebei Natural Gas Co., Ltd. 河北省天然气有限责任公司[1][2]
  • Parent company: Xintian Green Energy Co., Ltd. 新天绿色能源股份有限公司 (55%); Hongkong and China Gas (Hebei) Co., Ltd. 香港中华煤气 (河北) 有限公司 (43%); Ganzhou Maokang Investment Management Partnership (Limited Partnership) 赣州茂康投资管理合伙企业 (有限合伙) (2%)
  • Capacity: 15.1 billion cubic meters per year[1]
  • Length: 102 kilometers[3]
  • Diameter: 1219 millimeters[1]
  • Status: Construction
  • Start year:
  • Cost: 1.98 billion RMB[1]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 "天然气公司"京石邯"输气管道复线工程取得项目核准_公司动态_新天绿色能源股份有限公司". www.suntien.com. Retrieved 2021-10-01.
  2. ""京石邯"输气管道复线工程环境影响评价公众参与说明书" (PDF). Hebei Natural Gas Company. 2019-12-01.
  3. "天然气公司"京石邯"输气管道复线工程取得项目核准_公司动态_新天绿色能源股份有限公司". www.suntien.com. Retrieved 2021-10-01.

Related GEM.wiki articles

External resources

External articles