Bellefield Solar And Energy Storage Farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Bellefield Solar And Energy Storage Farm is a solar photovoltaic (PV) farm in pre-construction in Mojave, Kern County, California, United States.

Project Details

Table 1: Phase-level project details for Bellefield Solar And Energy Storage Farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Pre-construction[1] 2026 (planned)[1] 500 MWac[2] PV[2] Avantus[2] Avantus[2][3]
2 Pre-construction[1] 2025 (planned)[1] 500 MWac[2] PV[2] Avantus[2] Avantus[2][3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Bellefield Solar And Energy Storage Farm

Phase Name Location Coordinates (WGS 84)
1 Mojave, Kern County, California, United States[1] 35.0630, -118.0878 (exact)[2]
2 Mojave, Kern County, California, United States[1] 35.0178, -118.0687 (exact)[2]

The map below shows the exact locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. 2023. Retrieved September 29, 2023.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022. {{cite web}}: Check date values in: |archive-date= (help)
  3. 3.0 3.1 https://www.pv-tech.org/us-developer-8minute-solar-energy-rebrands-as-avantus/. {{cite web}}: Missing or empty |title= (help)