Bellefield Solar And Energy Storage Farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Bellefield Solar And Energy Storage Farm is an announced solar photovoltaic (PV) farm in Mojave, Kern County, California, United States.
Project Details
Table 1: Phase-level project details for Bellefield Solar And Energy Storage Farm
| Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
|---|---|---|---|---|---|---|
| 1 | Construction[1] | 2026 (planned)[2] | 500 MWac[1] | PV[1] | AES Corp[3] | Avantus[4] |
| 2 | Announced[5] | 2026 (planned)[1] | 500 MWac[1] | PV[1] | AES Corp[3] | Avantus[4] |
| 3 | Announced[1] | 2027 (planned)[1] | 150 MWac[1] | PV[1] | – | – |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Bellefield Solar And Energy Storage Farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Mojave, Kern County, California, United States[1] | 35.0630, -118.0878 (exact)[1] |
| 2 | Mojave, Kern County, California, United States[1] | 35.0178, -118.0687 (exact)[1] |
| 3 | Kern County, California, United States[1] | 35.0292, -117.9926 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ https://www.prnewswire.com/news-releases/aes-completes-first-phase-of-largest-solar-plus-storage-project-in-the-united-states-302478336.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://web.archive.org/web/20230607201623/https://renewablesnow.com/news/aes-buys-2-gw-solar-plus-storage-project-in-california-from-avantus-825177/.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://www.eia.gov/electricity/data/eia860m/ https://www.pv-tech.org/us-developer-8minute-solar-energy-rebrands-as-avantus/, https://www.eia.gov/electricity/data/eia860m/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}: Check date values in:|access-date=(help)
