Bendungan Merangin hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Bendungan Merangin hydroelectric plant (PLTA Bendungan Merangin PUPR) is a hydroelectric power plant in pre-construction in Simpang Parit Village, Renah Pembarap District, Merangin Regency, Jambi Province, Indonesia.
Project Details
Table 1: Project details for Bendungan Merangin hydroelectric plant
Status | Commissioning year | Nameplate capacity | Technology type |
---|---|---|---|
Pre-construction[1][2] | 2028 (planned)[3] | 107 MW[3] | Conventional storage[1] |
Location
Table 2: Location details for Bendungan Merangin hydroelectric plant
Location | Coordinates (WGS 84) |
---|---|
Simpang Parit Village, Renah Pembarap District, Merangin Regency, Jambi Province, Indonesia[1] | -2.1451, 102.053 (approximate)[1] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20221001072207/https://jambi.tribunnews.com/2022/02/08/bendungan-raksasa-merangin-segera-dibangun-sekarang-tahap-hitung-ganti-rugi. Archived from the original on 2022-10-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://simpulkpbu.pu.go.id/project/bendungan-merangin.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 "PT PLN (Persero), RUPTL - Rencana Usaha Penyediaan Tenaga Listrik PT. PLN (Persero) 2021-2030" (PDF). Archived (PDF) from the original on 2021-10-21. Retrieved November 15, 2021.