Bentley Motors solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Bentley Motors (Phase 2), Bentley Motors Ltd 1 (Phase 1)
Bentley Motors solar farm is an operating solar photovoltaic (PV) farm in Cheshire, North West, England, United Kingdom.
Project Details
Table 1: Phase-level project details for Bentley Motors solar farm
| Phase name | Status | Commissioning year | Nameplate capacity | Technology |
|---|---|---|---|---|
| 1 | Operating[1] | 2013[1] | 5.1 MW[1] | PV[1] |
| 2 | Operating[1] | 2018[1] | 2.9 MW[1] | PV[1] |
| Pyms Lane | Pre-construction[1] | – | 1.1 MW[1] | PV[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Bentley Motors solar farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Cheshire, North West, England, United Kingdom[1] | 53.1050, -2.4728 (exact)[1] |
| 2 | Cheshire, North West, England, United Kingdom[1] | 53.1059, -2.4722 (exact)[1] |
| Pyms Lane | Cheshire, North West, England, United Kingdom[1] | 53.1059, -2.4722 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
