Berezovskaya (Belarus) power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Berezovskaya (Belarus) power station (Березовская ГРЭС, пиково-резервный энергоисточник (ПРЭИ)) is an operating power station of at least 1095-megawatts (MW) in Beloozersk, Brest, Belarus with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Berezovskaya (Belarus) power station | Beloozersk, Brest, Belarus | 52.453863, 25.193031 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit CC3, Unit CC4, Unit CC5, Unit CC7, Unit GT1, Unit GT2, Unit GT3, Unit GT4, Unit GT5: 52.453863, 25.193031
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit CC3 | operating[2] | gas, fuel oil[2] | 215[2] | combined cycle[2] | yes[2] | 2005[3] | 2025 (planned) |
Unit CC4 | operating[2] | gas, fuel oil[2] | 215[2] | combined cycle[2] | yes[2] | 2003[3] | 2025 (planned) |
Unit CC5 | operating[2] | gas, fuel oil[2] | 238[2] | combined cycle[2] | yes[2] | 2008[3] | – |
Unit CC7 | operating[2] | gas, fuel oil[2] | 427[2] | combined cycle[2] | yes[2] | 2014[3] | – |
Unit GT1 | construction[4][5][6][7][8][9][10][11][12][12][13] | gas[5] | 57[14][15][16] | gas turbine[17] | yes[14][12][18] | 2023[19][4][10][20] | – |
Unit GT2 | construction[4][5][6][7][8][9][10][11][12][12][13] | gas[5] | 57[14][15][16] | gas turbine[17] | yes[14][12][18] | 2023[19][4][10][20] | – |
Unit GT3 | construction[4][5][6][7][8][9][10][11][12][12][13] | gas[5] | 57[14][15][16] | gas turbine[17] | yes[14][12][18] | 2023[19][4][10][20] | – |
Unit GT4 | construction[4][5][6][7][8][9][10][11][12][12][13] | gas[5] | 57[14][15][16] | gas turbine[17] | yes[14][12][18] | 2023[19][4][10][20] | – |
Unit GT5 | construction[4][5][6][7][8][9][10][11][12][12][13] | gas[5] | 57[14][15][16] | gas turbine[17] | yes[14][12][18] | 2023[19][4][10][20] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit CC3 | RUE Brestenergo[2] | SPA Belenergo [100.0%] |
Unit CC4 | RUE Brestenergo[2] | SPA Belenergo [100.0%] |
Unit CC5 | RUE Brestenergo[2] | SPA Belenergo [100.0%] |
Unit CC7 | RUE Brestenergo[2] | SPA Belenergo [100.0%] |
Unit GT1 | RUE Brestenergo[5][21] | SPA Belenergo [100.0%] |
Unit GT2 | RUE Brestenergo[5][21] | SPA Belenergo [100.0%] |
Unit GT3 | RUE Brestenergo[5][21] | SPA Belenergo [100.0%] |
Unit GT4 | RUE Brestenergo[5][21] | SPA Belenergo [100.0%] |
Unit GT5 | RUE Brestenergo[5][21] | SPA Belenergo [100.0%] |
Project-level captive use details
Background
In October 2021, construction of units 1-5 was already underway.[23] The turbines were delivered on-site and installed. Construction of associated infrastructure was underway. The project was expected to be completed in two phases: Phase I would include the commissioning of units GT3 and GT4, and Phase II of the remaining units GT1, GT2, and GT 5. The project was expected to be commissioned by 2022.[23] Construction was ongoing in April 2022.[24]Siemens supplies the gas turbines for the construction of units GT1-GT5.[23] After the start of the war, Siemens put all new business and international deliveries to Russia and Belarus on hold.[25] As of October 2022, the consequences for the delivery, operations, and maintenance of existing and planned Siemens gas turbines is unclear.[26]Units CC3 and CC4 are to retire in 2025, following the commissioning of the Astravets nuclear power plant.[27]As of October 2022, the completion of construction works on units GT1-5 was postponed from 2022 to 2023.[28]
In August 2023, it was reported that SCADA software designed for automation of operational-dispatch and operational-technical control of the power station had been installed at the plant.[29] As of December 2023, there have not been any further updates.
Articles and Resources
References
- ↑ https://www.google.com/maps/place/Berezovskaya+Gres+Belarus/@52.465937325.13898710234m/data=!3m1!1e3!4m5!3m4!1s0x47274a34f8948e2b:0xd0f0674adb405a5f!8m2!3d52.4525834!4d25.193367.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 https://web.archive.org/web/20221129184802/https://www.brestenergo.by/%D0%91%D0%B5%D1%80%D0%B5%D0%B7%D0%BE%D0%B2%D1%81%D0%BA%D0%B0%D1%8F_%D0%93%D0%A0%D0%AD%D0%A1. Archived from the original on 29 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20220709030313/https://brestobl.com/predpr/05bereza/gres_5.html. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 (PDF) https://web.archive.org/web/20220911200244/https://www.minenergo.gov.by/wp-content/uploads/2021/%D0%9F%D0%9A%D0%9C%D0%AD%202025-%D1%81.pdf. Archived from the original (PDF) on 11 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 https://web.archive.org/web/20211028012507/https://www.ekn.se/en/what-we-do/sustainability/transactions-with-environmental-and-social-impact-assessment/archive/new-250-mw-peakbackup-facility-at-existing-gas-power-plant-belarus/. Archived from the original on 28 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 https://web.archive.org/web/20220709034942/https://xn--80aaigboe2bzaiqsf7i.xn--p1ai/ENERGAZ-izgotovil-i-ispital-gazopriemnuyu-stantsiyu-dlya-pikovoy-GTES-Berezovskoy-GRES/. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 https://web.archive.org/web/20220130030823/https://www.interfax.ru/world/768861. Archived from the original on 30 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 https://web.archive.org/web/20220709023255/https://1reg.by/2021/04/29/modernizaciya-berezovskoy-gres-mozhet-byit-sorvana/. Archived from the original on 09 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 9.4 https://web.archive.org/web/20211022181719/https://telegraf.by/politika/sami-kreditujut-vlasti-belarusi-nesmotrya-ni-na-chto-siemens-prodolzhaet-postavlyat-turbiny-na-belaes/. Archived from the original on 22 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 10.8 10.9 https://belnipi.by/2021/10/28/stroitelstvo-pikovo-rezervnogo-istochnika-na-berezovskoj-grjes/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 11.3 11.4 https://energybase.ru/news/companies/pikovo-rezervnyj-energoistocnik-na-berezovskoj-gres-osnasen-gazopriemnoj-stancie-2022-04-04.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 12.12 12.13 12.14 https://web.archive.org/web/20221227172952/https://www.belta.by/regions/view/zapadnyj-forpost-belorusskoj-energosistemy-novye-zadachi-i-perspektivy-berezovskoj-gres-542099-2022/. Archived from the original on 27 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 13.3 13.4 https://web.archive.org/web/20240116201153/https://intechs.by/implementation/3. Archived from the original on 16 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 14.5 14.6 14.7 14.8 14.9 https://web.archive.org/web/20211028012507/https://www.ekn.se/en/what-we-do/sustainability/transactions-with-environmental-and-social-impact-assessment/archive/new-250-mw-peakbackup-facility-at-existing-gas-power-plant-belarus/.
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 15.0 15.1 15.2 15.3 15.4 https://web.archive.org/web/20210420233706/http://en.energas.ru/pressroom/news/rezervnaya-gazoturbinnaya-elektrostantsiya-sozdaetsya-na-novopolotskoy-tets-v-belarusi/. Archived from the original on 20 April 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 16.4 (PDF) https://web.archive.org/web/20220911200244/https://minenergo.gov.by/wp-content/uploads/2021/%D0%9F%D0%9A%D0%9C%D0%AD%202025-%D1%81.pdf (PDF).
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 17.0 17.1 17.2 17.3 17.4 https://web.archive.org/web/20210420212619/https://www.nsenergybusiness.com/news/siemens-gas-turbines-254mw/. Archived from the original on 20 April 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 18.3 18.4 https://www.power-technology.com/marketdata/power-plant-profile-berezovskaya-gas-power-plant-belarus/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 19.3 19.4 https://web.archive.org/web/20210420214002/https://www.gastopowerjournal.com/itemlist/tag/Belarus. Archived from the original on 20 April 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 20.2 20.3 20.4 https://web.archive.org/web/20221217104532/https://news.zerkalo.io/economics/24537.html. Archived from the original on 17 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 21.2 21.3 21.4 https://web.archive.org/web/20220629060440/https://neftegaz.ru/news/energy/732532-pikovo-rezervnyy-energoistochnik-na-berezovskoy-gres-osnashchen-gazopriemnoy-stantsiey-energaz/. Archived from the original on 29 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220930023722/https://vb.by/econom/goseconimic/vremya-bolshogo-pritoka-energeticheskij-gigant-brestchiny-berezovskaya-gres-pered-novym-godom-otmechaet-svoe-60-letie.html. Archived from the original on 30 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 23.0 23.1 23.2 "Строительство пиково-резервного источника на Березовской ГРЭС — Белнипиэнергопром". Retrieved July 13, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Пиково-резервный энергоисточник на Березовской ГРЭС оснащен газоприемной станцией «ЭНЕРГАЗ»". Retrieved July 13, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Siemens to wind down Russian business | Press | Company | Siemens". press.siemens.com. Retrieved 2022-10-26.
- ↑ "Приостановка сотрудничества с Siemens с Беларусью: последствия" (in русский). Retrieved 2022-10-26.
- ↑ (PDF) https://energodoc.by/js/pdfjs/web/viewer.html?file=/file/fulltext-view/8720.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221217104532/https://news.zerkalo.io/economics/24537.html.
{{cite web}}
:|archive-url=
requires|archive-date=
(help); Missing or empty|title=
(help) - ↑ "БЕРЕЗОВСКАЯ ГРЭС РУП "БРЕСТЭНЕРГО"". InnoTech Solutions. August 11, 2023. Retrieved December 11, 2023.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.