Bheramara power station is an operating power station of at least 410-megawatts (MW) in Chandgram, Khulna, Bangladesh.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Bheramara power station Chandgram, Khulna, Bangladesh 24.04938, 89.01749 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1: 24.04938, 89.01749

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1 operating[2][3][4] gas, diesel[5] 410[6][2][3] combined cycle[7] not found 2017[8]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 North-West Power Generation Company Limited (NWPGCL)[8][9] Bangladesh Power Development Board (BPDB) [100.0%]

Background

In 2000, the plant was proposed.[10]

The plant was built to meet the growing electricity demand in the country.[10]

As of December 2007, the country's demand increased by about 8% per annum. The anticipated demand in 2012, 2017, and 2025 were 7,732 MW, 11,291 MW, and 19,312 MW, respectively.[10] Thus more than 5,000 MW of capacity was needed to be urgently built by 2015, and around 20,000 MW of capacity should be necessitated by 2025 to meet the future demand, taking account 25% of the reserve margin. Again in 2007, Japan International Cooperation Agency conducted feasibility studies.

In July 2014, construction of the plant started.[11]

In 2017, 278 MW of the plant was commissioned. The power plant was partly commissioned earlier in Open Cycle, which was handed over to NWPGCL for commercial operation in May 2017.[12]

In 2018, the remaining 132 MW of the plant was commissioned.[12]

Articles and Resources

References

  1. https://www.google.com/maps/place/Bheramara+410+MW+Combined+Cycle+Power+Plant/@24.049377189.01749241021m/data=!3m1!1e3!4m12!1m6!3m5!1s0x0:0x3b0c97c4129c7a91!2sBheramara+410+MW+Combined+Cycle+Power+Plant!8m2!3d24.0500948!4d89.0174924!3m4!1s0x0:0x3b0c97c4129c7a91!8m2!3d24.0500948!4d89.0174924. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20220629072050/https://www.arx.cfa/~/media/AD0129173C34401196A0DA6F7C338035.ashx. Archived from the original on 29 June 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20221010034009/http://119.40.95.168/bpdb/daily_generation. Archived from the original on 10 October 2022. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://web.archive.org/web/20240125081209/https://bpdb.portal.gov.bd/sites/default/files/files/bpdb.portal.gov.bd/annual_reports/7b792f67_bf50_4b3d_9bef_8f9b568005c9/2022-11-29-05-22-0dea17e09d8a84e72a63312df6b5bdc6.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240206155457/https://apscl.portal.gov.bd/site/page/cd3fe5b9-5cc8-4e44-8323-4af092a1f75a/-. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. https://web.archive.org/web/20211117013113/http://bpdb.gov.bd/bpdb_new/index.php/site/daily_generation_report. Archived from the original on 17 November 2021. {{cite web}}: Missing or empty |title= (help)
  7. (PDF) https://web.archive.org/web/20220509104502/https://bdcom.bpdb.gov.bd/bpdb_new/resourcefile/annualreports/annualreport_1640756525_Annual_Report_2020-2021_latest.pdf. Archived from the original (PDF) on 09 May 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  8. 8.0 8.1 "BPDB Annual Report 2019-2020". Archived from the original on January 18, 2022. Retrieved February 4, 2021.
  9. https://web.archive.org/web/20220117050620/https://bd.bpdb.gov.bd/bpdb_new/index.php/site/daily_generation_report. Archived from the original on 17 January 2022. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 (PDF). 2007 https://www.jica.go.jp/english/our_work/social_environmental/archive/pro_asia/pdf/ban02_02.pdf. {{cite web}}: Missing or empty |title= (help)CS1 maint: url-status (link)
  11. Larson, Aaron (January 2018). https://www.powermag.com/press-releases/lt-commissions-360-mw-bheramara-combined-cycle-power-plant-in-bangladesh/. {{cite web}}: Missing or empty |title= (help)CS1 maint: url-status (link)
  12. 12.0 12.1 "BPDB Annual Report 2019-2020". Archived from the original on January 18, 2022. Retrieved February 4, 2021.

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.