Bheri Babai hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Other names: Bheri Babai Diversion Multipurpose Project (BBDMP)
Bheri Babai hydroelectric plant is a hydroelectric power plant under construction in Bheri Ganga, Surkhet, Karnali, Nepal.
Project Details
Table 1: Project details for Bheri Babai hydroelectric plant
| Status | Commissioning year | Nameplate capacity | Turbines | Technology type |
|---|---|---|---|---|
| Construction[1][2] | 2028 (planned)[1] | 46 MW[2] | 3[3] | Run-of-river[3] |
Location
Table 2: Location details for Bheri Babai hydroelectric plant
| Location | River | Coordinates (WGS 84) |
|---|---|---|
| Bheri Ganga, Surkhet, Karnali, Nepal[3][4] | Bheri River[1] | 28.4469, 81.7025 (approximate)[3][4] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://kathmandupost.com/money/2025/03/29/bheri-babai-irrigation-hydropower-project-pushed-back-further.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://www.bbdmp.gov.np/.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 https://janatakojalavidhyut.gov.np/project/bheri-babai-diversion?lan=en.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://maps.app.goo.gl/M7AJ5Z2RmHdML6He8.
{{cite web}}: Missing or empty|title=(help)
