Bhola power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Bhola power station is an operating power station of at least 445-megawatts (MW) in Bhola, Barisal, Bangladesh.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Bhola power station Bhola, Barisal, Bangladesh 22.47929, 90.71096 (exact)[1][2]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 22.47929, 90.71096

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1 operating[3][4][5] gas[4] 225[4][5] combined cycle[6] not found 2015[7]
Unit 2 operating[5] gas, diesel[6] 220[6][5] combined cycle[6] not found 2021[6]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Bangladesh Power Development Board (BPDB)[7][8] Bangladesh Power Development Board (BPDB) [100.0%]
Unit 2 Nutan Bidyut (Bangladesh) Limited[9][8] Shapoorji Pallonji And Company Private Limited [100.0%]

Background

In 2015, the first unit came online.[10]

In August 2017, Dhaka Tribune reported that the Power Development Board (PDB) had signed a power purchase agreement (PPA) with Nutan Bidyut Bangladesh Limited on Monday to set up a 220 MW power plant in Bhola.[11] The combined-cycle power plant was expected to be an independent power producer which will sell electricity to PDB for 22 years. Authorities estimated that the plant would supply the national grid by December 2019.[11] The plant will produce 220 MW using natural gas and 212 MW with diesel in case there is a gas shortage.[11]

In 2021, the second unit came online.[12]

Articles and Resources

References

  1. https://www.google.com/maps/place/Bhola+225+MW+Combined+Cycle+Power+Plant+BPDB+Borhanuddin+Bhola./@22.479292390.71095661737m/data=!3m1!1e3!4m12!1m6!3m5!1s0x0:0x5681370fd3acd7fd!2sBhola+225+MW+Combined+Cycle+Power+Plant+BPDB+Borhanuddin+Bhola.!8m2!3d22.4787263!4d90.7101698!3m4!1s0x0:0x5681370fd3acd7fd!8m2!3d22.4787263!4d90.7101698. {{cite web}}: Missing or empty |title= (help)
  2. https://www.google.com/maps/place/220+MW+CCPP+Nutan+Bidyut+(Bangladesh)+Ltd/@22.478583890.7094768355m/data=!3m1!1e3!4m12!1m6!3m5!1s0x0:0x5681370fd3acd7fd!2sBhola+225+MW+Combined+Cycle+Power+Plant+BPDB+Borhanuddin+Bhola.!8m2!3d22.4787263!4d90.7101698!3m4!1s0x0:0xf392d14fb54afbff!8m2!3d22.4785829!4d90.7089957. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20211117013113/http://bpdb.gov.bd/bpdb_new/index.php/site/daily_generation_report. Archived from the original on 17 November 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20220629072050/https://www.arx.cfa/~/media/AD0129173C34401196A0DA6F7C338035.ashx. Archived from the original on 29 June 2022. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 https://web.archive.org/web/20221010034009/http://119.40.95.168/bpdb/daily_generation. Archived from the original on 10 October 2022. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 (PDF) https://web.archive.org/web/20220509104502/https://bdcom.bpdb.gov.bd/bpdb_new/resourcefile/annualreports/annualreport_1640756525_Annual_Report_2020-2021_latest.pdf. Archived from the original (PDF) on 09 May 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 "BPDB Annual Report 2019-2020". Archived from the original on January 18, 2022. Retrieved February 4, 2021.
  8. 8.0 8.1 https://web.archive.org/web/20220117050620/https://bd.bpdb.gov.bd/bpdb_new/index.php/site/daily_generation_report. Archived from the original on 17 January 2022. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20220403064952/http://nutanbidyut.com/about.html. Archived from the original on 03 April 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  10. "BPDB Annual Report 2019-2020". Archived from the original on January 18, 2022. Retrieved February 4, 2021.
  11. 11.0 11.1 11.2 "First power plant fully funded by India to be set up in Bhola". Dhaka Tribune. 2017-08-29. Retrieved 2022-08-17.
  12. (PDF) https://bdcom.bpdb.gov.bd/bpdb_new/resourcefile/annualreports/annualreport_1640756525_Annual_Report_2020-2021_latest.pdf. {{cite web}}: Missing or empty |title= (help)CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.