Big Hollow Energy Center

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Big Hollow Energy Center is a power station in pre-construction in Festus, Jefferson, Missouri, United States. It is also known as Big Hollow CTG Project.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Big Hollow Energy Center Festus, Jefferson, Missouri, United States 38.130869, -90.2628 (exact)[1][2]
Loading map...

Unit-level coordinates (WGS 84):

  • 1, 2, 3, 4: 38.130869, -90.2628

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
1 Pre-construction[1][2][3] fossil gas: natural gas, fossil liquids: fuel oil[1][2] 200[1][2] gas turbine[1][2] 2028 (planned)[1][2]
2 Pre-construction[1][2][3] fossil gas: natural gas, fossil liquids: fuel oil[1][2] 200[1][2] gas turbine[1][2] 2028 (planned)[1][2]
3 Pre-construction[1][2][3] fossil gas: natural gas, fossil liquids: fuel oil[1][2] 200[1][2] gas turbine[1][2] 2028 (planned)[1][2]
4 Pre-construction[1][2][3] fossil gas: natural gas, fossil liquids: fuel oil[1][2] 200[1][2] gas turbine[1][2] 2028 (planned)[1][2]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
1 Union Electric[1][2] Union Electric Co [100%][1][2] Ameren Corp [100.0%]
2 Union Electric[1][2] Union Electric Co [100%][1][2] Ameren Corp [100.0%]
3 Union Electric[1][2] Union Electric Co [100%][1][2] Ameren Corp [100.0%]
4 Union Electric[1][2] Union Electric Co [100%][1][2] Ameren Corp [100.0%]

Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 (PDF) https://s21.q4cdn.com/448935352/files/doc_downloads/2025/03/25-02-28-2025-Change-in-Preferred-Plan-Report-Public.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 https://efis.psc.mo.gov/Document/Display/837646. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://www.amereninvestors.com/investors/financial-releases/financial-releases-details/2025/Ameren-unveils-new-hybrid-energy-center-combining-natural-gas-and-energy-storage-to-supply-reliable-energy-when-Missouri-needs-it-most/default.aspx. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.