Bisko solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: SE Bisko
Bisko solar farm is a shelved solar farm in Split-Dalmatia County, Croatia.
Project Details
Table 1: Phase-level project details for Bisko solar farm
Status | Nameplate capacity | Technology | Owner |
---|---|---|---|
Shelved (inferred April 2023) | 50 MWp/dc[1] | PV[2] | EnergoVizija DOO[1] |
Read more about solar capacity ratings.
Location
Table 2: Phase-level location details for Bisko solar farm
Location | Coordinates (WGS 84) |
---|---|
Split-Dalmatia County, Croatia[1] | 43.5818, 16.7002 (exact)[1] |
The map below shows the exact location of the solar farm:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 (PDF) https://mingor.gov.hr/UserDocsImages/UPRAVA-ZA-PROCJENU-UTJECAJA-NA-OKOLIS-ODRZIVO-GOSPODARENJE-OTPADOM/Opuo/29_7_2020_Elaborat_SE_Bisko.pdf.
{{cite web}}
:|archive-url=
requires|archive-date=
(help); Missing or empty|title=
(help) - ↑ "mingor.gov.hr/UserDocsImages/UPRAVA-ZA-PROCJENU-UTJECAJA-NA-OKOLIS-ODRZIVO-GOSPODARENJE-OTPADOM/Opuo/OPUO_2021/14_12_2021_Elaborat_SE_Ljubitovica.pdf" (PDF). Archived from the original (PDF) on March 11, 2022. Retrieved March 15, 2022.