Bitola solar farm is a solar photovoltaic (PV) farm in pre-construction in Bitola, Bitola Municipality, Pelagonia Region, North Macedonia.
Project Details
Table 1: Phase-level project details for Bitola solar farm
Phase name | Status | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
1 | Pre-construction[1] | 20 MW[2] | PV[1] | Elektrani na Severna Makedonija (ESM) [100%][2] |
2 | Pre-construction[1] | 60 MW[2] | PV[1] | Elektrani na Severna Makedonija (ESM) [100%][2] |
3 | Pre-construction[1] | 100 MW[2] | PV[1] | Elektrani na Severna Makedonija (ESM) [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Bitola solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Bitola, Bitola Municipality, Pelagonia Region, North Macedonia[2] | 41.0316, 21.3303 (approximate)[2] |
2 | Bitola, Bitola Municipality, Pelagonia Region, North Macedonia[2] | 41.0316, 21.3303 (approximate)[2] |
3 | Bitola, Bitola Municipality, Pelagonia Region, North Macedonia[2] | 41.0316, 21.3303 (approximate)[2] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240207130848/https://www.constructionbriefing.com/news/north-macedonia-s-pv-plant-to-start-construction-soon/8024491.article. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 https://web.archive.org/web/20240201213319/https://balkangreenenergynews.com/photovoltaic-project-of-50-mw-underway-next-to-coal-complex-in-north-macedonia/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)