Blue Springs solar farm

From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project.

Blue Springs solar farm is a solar farm under construction in Marianna, Jackson County, Florida, United States.


Project Details

The solar farm has one phase that is at least 20 MW. (Read more about solar capacity ratings.)

Table 1: Phase-level project details for Blue Springs solar farm

Phase name Status Commissioning year Nameplate capacity Owner Operator
1 Construction[1] 2022 (planned)[2] 74 MWac[1] NextEra Energy[3] NextEra Energy[1]

Location

Table 2: Phase-level location details for Blue Springs solar farm

Phase name Location Coordinates (WGS 84)
1 Marianna, Jackson County, Florida, United States[1] 30.7829, -85.0787 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Retrieved May 21, 2021.
  2. "Florida Power & Light Turns Packaging Into Mulch At Its Solar Energy Centers". Daily Energy Insider. December 20, 2021. Archived from the original on December 20, 2021. Retrieved February 14, 2022.
  3. "Gulf Power Breaks Ground On Two Large Solar Projects And One Massive Battery System". Pv Magazine Usa. February 25, 2021. Archived from the original on April 15, 2021. Retrieved February 14, 2022.