Bluegrass power station is a power station in pre-construction in Jeffersonville, Fayette, Ohio, United States.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Bluegrass power station Jeffersonville, Fayette, Ohio, United States 39.6323639, -83.5876333 (exact)[1][2][3]
Loading map...

Unit-level coordinates (WGS 84):

  • 1: 39.6323639, -83.5876333

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
1 Pre-construction[4][5][1][6][7] fossil gas: natural gas, fossil liquids: diesel[1][6][3] 968.8[1][6][8][9] gas turbine[1][6] 2028 (planned)[1][6][8] no

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 Bluegrass Power Generation LLC [100%][1] Blackstone Group Inc [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): power[1]
  • Captive industry: Data Center[1]
  • Non-industry use: none[1]

Impacts

Potential emissions and details on the project's status and permit applications can be viewed on Oil and Gas Watch page here.

The Oil and Gas Watch database, created by Environmental Integrity Project (EIP), is a free, public-facing tool designed to track the rapid expansion of fossil fuel and petrochemical infrastructure in the United States. Oil and Gas Watch maps new and expanding oil, gas, and petrochemical infrastructure projects across the country and monitors each project’s construction status so the public can stay informed about major oil and gas developments being proposed in their communities. We track key environmental approvals companies must obtain before starting construction or operations and provide access to thousands of government records and permits unearthed by our analysts.

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

In June 2025, Bluegrass Power Generation LLC (Bluegrass Power) filed an application with the Ohio Power Siting Board (OPSB) to construct a behind-the-meter, gas-fired power plant in Jefferson Township, Fayette County, Ohio. The facility would supply dedicated electricity to nearby third-party facilities at the Midwest Mega Commerce Center (M2C2). Bluegrass Power proposes installing up to 32 LM2500Xpress+G4 (or equivalent) simple-cycle gas turbines, capable of dual-fuel operation, to ensure at least 800 MW of reliable capacity. The project is designed as two 400-MW blocks, each containing either 16 GE LM2500 turbines or 15 Solar Titan 350 units. The plant is intended to provide dedicated baseload and peaking capacity for future industrial customers in the immediate area using natural gas-fired generation. Construction for Unit 1 is planned from February 2026 to February 2029, with commissioning completed by Q4 2028 and an in-service date in Q1 2029. Construction for Unit 2 is planned from July 2027 to February 2029, with commissioning completed by Q1 2030. The commercial operation date for Block 2 will depend on market conditions.[10]

According to the website of the OPSB, the local public hearing regarding the project will take place in November 2025 and the evidentiary hearing in December 2025.[11]

Impacts

Potential emissions and details on the project's status and permit applications can be viewed on Oil and Gas Watch page here.

The Oil and Gas Watch database, created by Environmental Integrity Project (EIP), is a free, public-facing tool designed to track the rapid expansion of fossil fuel and petrochemical infrastructure in the United States. Oil and Gas Watch maps new and expanding oil, gas, and petrochemical infrastructure projects across the country and monitors each project’s construction status so the public can stay informed about major oil and gas developments being proposed in their communities. We track key environmental approvals companies must obtain before starting construction or operations and provide access to thousands of government records and permits unearthed by our analysts.

Articles and Resources

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 "Bluegrass Power". Bluegrass Power. Archived from the original on 2026-02-05. Retrieved 2025-04-30.
  2. ↑ "Request Rejected". dis.puc.state.oh.us. Archived from the original on 2025-07-08. Retrieved 2025-07-04.
  3. ↑ 3.0 3.1 "Exhibit D: Air Permit". dis.puc.state.oh.us. Archived from the original on 2025-07-08. Retrieved 2025-07-04.
  4. ↑ (PDF) https://ukozvhzgrcnkcatjqfoo.supabase.co/storage/v1/object/public/03-00-air-construction/2026_01_28_Bluegrass_Power_Generation_Facility_P01_c58170b3.pdf. {{cite web}}: Missing or empty |title= (help)
  5. ↑ https://www.recordherald.com/2026/03/23/fayette-county-announces-major-road-extensions-800-megawatt-power-plant/. {{cite web}}: Missing or empty |title= (help)
  6. ↑ 6.0 6.1 6.2 6.3 6.4 https://web.archive.org/web/20260205011409/https://dis.puc.state.oh.us/ViewImage.aspx?CMID=A1001001A25C18B05643H00629. Archived from the original on 2026-02-05. {{cite web}}: Missing or empty |title= (help)
  7. ↑ https://opsb.ohio.gov/cases/25-0227-el-bgn. {{cite web}}: Missing or empty |title= (help)
  8. ↑ 8.0 8.1 https://dis.puc.state.oh.us/DocumentRecord.aspx?DocID=ca0ba322-0a3b-43d6-bb6f-c813318976e8. {{cite web}}: Missing or empty |title= (help)
  9. ↑ (PDF) https://ukozvhzgrcnkcatjqfoo.supabase.co/storage/v1/object/public/03-00-air-construction/2025_02_25_Bluegrass_Power_Generation_Facility_P01_e4390ea1.pdf. {{cite web}}: Missing or empty |title= (help)
  10. ↑ "Document Record". dis.puc.state.oh.us. 2025-06-09. Retrieved 2025-11-19.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ "Case Number: 25-0227-EL-BGN". POSB. Retrieved 2025-11-19.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.