Blyth Offshore wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Blyth Offshore Wind Test Site, Blyth Offshore Demonstrator Limited (BODL), Blyth Demonstration Phase I, Blyth Offshore Wind Farm Phase 2 Demonstrator Project, Blyth Offshore Demonstrator Limited (BODL), Blyth Demo Phases 2 & 3

Blyth Offshore wind farm is an operating wind farm in United Kingdom.

Project Details

Table 1: Phase-level project details for Blyth Offshore wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2017[1] 42 MW[1] Offshore hard mount[1] EDF Renewables[2] EDF Renewables[1]
2 Pre-construction[1] 58 MW[3] Offshore floating[1] EDF Renewables [51%]; Vantage RE LTD; Tenaga Nasional BHD (TNB)[4] EDF Renewables[2]
RP1 Retired[1] 2000[1] 4 MW[1] Offshore mount unknown[1]

Location

Table 2: Phase-level location details for Blyth Offshore wind farm

Phase Name Location Coordinates (WGS 84)
1 United Kingdom 55.167, -1.3644 (exact)[1]
2 Ashington, United Kingdom[5][6] 55.167, -1.3644 (exact)[1]
RP1 England, United Kingdom[1] 55.1361, -1.4901 (exact)[1]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 "Renewable Energy Planning Database". United Kingdom Government. March, 2021. Archived from the original on June 21, 2021. Retrieved May 24, 2021. {{cite web}}: Check date values in: |date= (help)
  2. 2.0 2.1 (PDF) https://www.thecrownestate.co.uk/media/3954/offshore-wind-project-listing.pdf. {{cite web}}: Missing or empty |title= (help)
  3. https://www.edfenergy.com/media-centre/news-releases/blyth-offshore-wind-farm-phase-two-expansion-underway-using-floating. {{cite web}}: Missing or empty |title= (help)
  4. https://renews.biz/73014/edf-renewables-picks-up-new-blyth-partner/. {{cite web}}: Missing or empty |title= (help)
  5. -1.5925207
  6. https://www.google.com/maps/search/Tyne/@55.080979642854m/data=!3m1!1e3. {{cite web}}: Missing or empty |title= (help)