Blythe (NextEra) solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Blythe Solar IV, Blythe Solar III Hybrid, Blythe Solar 110, Blythe Solar II
Blythe (NextEra) solar farm is an operating solar photovoltaic (PV) farm in Riverside County, California, United States.
Project Details
Table 1: Phase-level project details for Blythe (NextEra) solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1A | Operating[1] | 2016[1] | 39 MWac[1] | PV[1] | NextEra Energy INC[2] | NextEra Energy INC[1] |
1B | Operating[1] | 2016[1] | 36 MWac[1] | PV[1] | NextEra Energy INC[2] | NextEra Energy INC[1] |
1C | Operating[1] | 2016[1] | 35 MWac[1] | PV[1] | NextEra Energy INC[2] | NextEra Energy INC[1] |
2A | Operating[1] | 2016[1] | 33 MWac[1] | PV[1] | NextEra Energy INC[2] | NextEra Energy INC[1] |
2B | Operating[1] | 2016[1] | 34 MWac[1] | PV[1] | NextEra Energy INC[2] | NextEra Energy INC[1] |
2C | Operating[1] | 2016[1] | 32 MWac[1] | PV[1] | NextEra Energy INC[2] | NextEra Energy INC[1] |
2D | Operating[1] | 2016[1] | 32 MWac[1] | PV[1] | NextEra Energy INC[2] | NextEra Energy INC[1] |
3A | Operating[1] | 2020[1] | 137 MWac[1] | PV[1] | NextEra Energy INC[2] | NextEra Energy INC[1] |
4A | Operating[1] | 2020[1] | 69 MWac[1] | PV[1] | NextEra Energy INC[2] | NextEra Energy INC[1] |
4B | Operating[1] | 2020[1] | 69 MWac[1] | PV[1] | NextEra Energy INC[2] | NextEra Energy INC[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Blythe (NextEra) solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1A | Riverside County, California, United States[3] | 33.6801, -114.7420 (exact)[1] |
1B | Riverside County, California, United States[3] | 33.6801, -114.7420 (exact)[1] |
1C | Riverside County, California, United States[3] | 33.6801, -114.7420 (exact)[1] |
2A | Riverside County, California, United States[3] | 33.6801, -114.7300 (exact)[1] |
2B | Riverside County, California, United States[3] | 33.6801, -114.7300 (exact)[1] |
2C | Riverside County, California, United States[3] | 33.6740, -114.7440 (exact)[4] |
2D | Riverside County, California, United States[3] | 33.6740, -114.7440 (exact)[5] |
3A | Riverside County, California, United States[3] | 33.6560, -114.7420 (exact)[1] |
4A | Riverside County, California, United States[3] | 33.6820, -114.7680 (exact)[1] |
4B | Riverside County, California, United States[3] | 33.6820, -114.7680 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 1.49 1.50 1.51 1.52 1.53 1.54 1.55 1.56 1.57 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022.
{{cite web}}
: Check date values in:|archive-date=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 https://www.energy.ca.gov/powerplant/pv/blythe-solar-power-project.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.
- ↑ WKSL2023
- ↑ WKSL2023