Bonyic hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Bonyic hydroelectric plant (Central Hidroeléctrica Bonyic) is an operating hydroelectric power plant in Changuinola, Bocas del Toro, Panama.
Project Details
Table 1: Project details for Bonyic hydroelectric plant
| Status | Commissioning year | Nameplate capacity | Turbines | Owner |
|---|---|---|---|---|
| Operating[1] | 2015[1] | 32 MW[1] | 3[1] | Grupo EPM[1] |
Location
Table 2: Location details for Bonyic hydroelectric plant
| Location | River | Coordinates (WGS 84) |
|---|---|---|
| Changuinola, Bocas del Toro, Panama[1][2][3] | Río Bonyic[4] | 9.3218, -82.6475 (exact)[1][2][3] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 (PDF) https://www.epm.com.co/content/dam/epm/inversionistas/bonyicentroenoperacion-febrero18.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 (PDF) [www.asep.gob.pa/wp-content/uploads/electricidad/pades/bocas_toro/bonyic_v2022.pdf www.asep.gob.pa/wp-content/uploads/electricidad/pades/bocas_toro/bonyic_v2022.pdf].
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 3.0 3.1 https://maps.app.goo.gl/x3vkQ7qPoc9PY5L18.
{{cite web}}: Missing or empty|title=(help) - ↑ https://ejatlas.org/print/proyecto-hidroelectrico-bonyic-panama.
{{cite web}}: Missing or empty|title=(help)
