Borderlands wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Borderlands wind farm is an operating wind farm in Catron County, New Mexico, United States.

Project Details

Table 1: Phase-level project details for Borderlands wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2021[2] 100 MW[3] Onshore[3] NextEra Energy INC[4] NextEra Energy INC[4]

Location

Table 2: Phase-level location details for Borderlands wind farm

Phase Name Location Coordinates (WGS 84)
1 Catron County, New Mexico, United States[3] 34.1031, -108.9078 (exact)[5]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. USEia2021ER
  2. USEia2021ER
  3. 3.0 3.1 3.2 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
  4. 4.0 4.1 https://www.blm.gov/programs/planning-and-nepa/plans-in-development/new-mexico/proposed-borderlands-wind-project. {{cite web}}: Missing or empty |title= (help)
  5. USWind2023