Borderlands wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Borderlands wind farm is an operating wind farm in Catron County, New Mexico, United States.
Project Details
Table 1: Phase-level project details for Borderlands wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2021[2] | 100 MW[3] | Onshore[3] | NextEra Energy INC[4] | NextEra Energy INC[4] |
Location
Table 2: Phase-level location details for Borderlands wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Catron County, New Mexico, United States[3] | 34.1031, -108.9078 (exact)[5] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ USEia2021ER
- ↑ USEia2021ER
- ↑ 3.0 3.1 3.2 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
- ↑ 4.0 4.1 https://www.blm.gov/programs/planning-and-nepa/plans-in-development/new-mexico/proposed-borderlands-wind-project.
{{cite web}}
: Missing or empty|title=
(help) - ↑ USWind2023