Borg Bouarreridj solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Bordj Bouarreridj solar plant

Borg Bouarreridj solar farm is a cancelled solar farm in Hauts plateaux east, Bordj Bouarreridj, Algeria.


Project Details

Table 1: Phase-level project details for Borg Bouarreridj solar farm

Status Nameplate capacity Technology Owner
Cancelled (inferred August 2022) 15 MW[1] PV[1] Shariket Kahraba wa Taket Moutadjadida SPA (SKTM) (سونلغاز)[2]

Read more about solar capacity ratings.

Location

Table 2: Phase-level location details for Borg Bouarreridj solar farm

Location Coordinates (WGS 84)
Hauts plateaux east, Bordj Bouarreridj, Algeria[1][2] 28.0010, 3.0010 (approximate)[2]

The map below shows the approximate location of the solar farm phase:

Loading map...


Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 "343 Mw Solar Power Plants Under Construction In Algeria". Archived from the original on February 28, 2021. Retrieved December 13, 2021.
  2. 2.0 2.1 2.2 "Algeria Drops 10,000Mw Energy Export Plans". Meed. November 24, 2014. Archived from the original on July 22, 2021. Retrieved December 13, 2021.