Borkum Riffgrund 2 wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Borkum Riffgrund 2 wind farm is an operating wind farm in Juist, Germany.

Project Details

Table 1: Phase-level project details for Borkum Riffgrund 2 wind farm

Status Commissioning year Nameplate capacity Type Owner Operator
Operating[1] 2019[1] 450 MW[1] Offshore hard mount[2] Gulf Energy Development PCL [25%]; Keppel CORP [4%]; Ørsted A/S [50%]; Keppel Infrastructure Trust (KIT) [20%] (บริษัท กัลฟ์ เอ็นเนอร์จี ดีเวลลอปเมนท์ จำกัด (มหาชน))[3][3][3][3] Ørsted[3]

Location

Table 2: Phase-level location details for Borkum Riffgrund 2 wind farm

Location Coordinates (WGS 84)
Juist, Germany[2] 53.9665, 6.5493 (exact)[2]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20240126003156/https://www.nsenergybusiness.com/projects/borkum-riffgrund-3-offshore-wind-farm/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240125152611/https://www.smard.de/en/ueberblick. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20240131060827/https://renews.biz/79789/keppel-buys-25-stake-in-465mw-borkum-riffgrund-2/. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)