Boswell wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Boswell wind farm is a cancelled wind farm in Rpcl Rover, Albany County, Wyoming, United States.
Project Details
Table 1: Phase-level project details for Boswell wind farm
Phase name | Status | Nameplate capacity | Type | Owner |
---|---|---|---|---|
1 | Cancelled[1] | 80 MW[1] | Onshore[1] | Alterra Power CORP[2] |
2 | Cancelled[1] | 80 MW[1] | Onshore[1] | Alterra Power CORP[2] |
3 | Cancelled[1] | 80 MW[1] | Onshore[1] | Alterra Power CORP[2] |
4 | Cancelled[1] | 80 MW[1] | Onshore[1] | Alterra Power CORP[2] |
Location
Table 2: Phase-level location details for Boswell wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Rpcl Rover, Albany County, Wyoming, United States[1] | 41.919, -105.869 (approximate)[1] |
2 | Rock River, Albany County, Wyoming, United States[1] | 41.869, -105.832 (approximate)[1] |
3 | Rock River, Albany County, Wyoming, United States[1] | 41.923, -105.792 (approximate)[1] |
4 | Rock River, Albany County, Wyoming, United States[1] | 41.912, -105.752 (approximate)[1] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
- ↑ 2.0 2.1 2.2 2.3 https://www.windpowerengineering.com/alterra-acquires-320-mw-boswell-springs-wind-project/.
{{cite web}}
: Missing or empty|title=
(help)