Boswell wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Boswell wind farm is a cancelled wind farm in Rpcl Rover, Albany County, Wyoming, United States.

Project Details

Table 1: Phase-level project details for Boswell wind farm

Phase name Status Nameplate capacity Type Owner
1 Cancelled[1] 80 MW[1] Onshore[1] Alterra Power CORP[2]
2 Cancelled[1] 80 MW[1] Onshore[1] Alterra Power CORP[2]
3 Cancelled[1] 80 MW[1] Onshore[1] Alterra Power CORP[2]
4 Cancelled[1] 80 MW[1] Onshore[1] Alterra Power CORP[2]

Location

Table 2: Phase-level location details for Boswell wind farm

Phase Name Location Coordinates (WGS 84)
1 Rpcl Rover, Albany County, Wyoming, United States[1] 41.919, -105.869 (approximate)[1]
2 Rock River, Albany County, Wyoming, United States[1] 41.869, -105.832 (approximate)[1]
3 Rock River, Albany County, Wyoming, United States[1] 41.923, -105.792 (approximate)[1]
4 Rock River, Albany County, Wyoming, United States[1] 41.912, -105.752 (approximate)[1]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
  2. 2.0 2.1 2.2 2.3 https://www.windpowerengineering.com/alterra-acquires-320-mw-boswell-springs-wind-project/. {{cite web}}: Missing or empty |title= (help)