Botekoshi 5 hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Other names: Bhotekoshi 5, Bote Koshi 5
Botekoshi 5 hydroelectric plant is a hydroelectric power plant in pre-construction in Ramche Village, Rasuwa District, Bagmati Zone, Bagmati Province, Nepal.
Project Details
Table 1: Project details for Botekoshi 5 hydroelectric plant
| Status | Nameplate capacity | Turbines | Technology type | Owner |
|---|---|---|---|---|
| Pre-construction[1][2][3] | 62 MW[4] | 2[5] | Run-of-river[6] | Kalika Energy [100%][6] |
Location
Table 2: Location details for Botekoshi 5 hydroelectric plant
| Location | River | Coordinates (WGS 84) |
|---|---|---|
| Ramche Village, Rasuwa District, Bagmati Zone, Bagmati Province, Nepal[7] | Bhotekoshi River[4] | 27.789, 85.8838 (approximate)[7] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20230917204345/http://www.doed.gov.np/license/66. Archived from the original on 2023-09-17.
{{cite web}}: Missing or empty|title=(help) - ↑ https://doed.gov.np/pages/clhydromorethan1/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://kathmandupost.com/province-no-3/2025/06/15/locals-protest-against-new-hydropower-project-in-sindhupalchok.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://www.nwrmap.info/hydropower/botekoshi-5-hep.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220810231625/https://www.power-technology.com/marketdata/bhotekoshi-5-nepal/. Archived from the original on 2022-08-10.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 https://web.archive.org/web/20221128041310/https://geoceconsultants.com/portfolio/environment-impact-assessment-study-of-bhote-koshi-5-hydroelectric-project-60-mw-2/. Archived from the original on 2022-11-28.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 https://web.archive.org/web/20221206083000/https://hydro.naxa.com.np/core/datasets/. Archived from the original on 2022-12-06.
{{cite web}}: Missing or empty|title=(help)
