Brenneman Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Brenneman Solar is a solar farm in pre-construction in Macon County, Georgia, United States.
Project Details
Table 1: Phase-level project details for Brenneman Solar
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 150 MWac[2] | PV[3] | Doral Renewables LLC[2] | Doral Renewables LLC[3] |
Read more about solar capacity ratings.
Location
Table 2: Phase-level location details for Brenneman Solar
Location | Coordinates (WGS 84) |
---|---|
Macon County, Georgia, United States[2] | 32.8151, -83.7246 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://gegrenewables.com/brenneman-solar. Archived from the original on August 16, 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 "Doral Picks Up 150Mw Us Solar From Avangrid". Renews. December 22, 2021. Archived from the original on December 25, 2021. Retrieved February 14, 2022.
- ↑ 3.0 3.1 https://solarindustrymag.com/doral-acquires-150-mw-brenneman-solar-project-from-avangrid. Archived from the original on August 16, 2022.
{{cite web}}
: Missing or empty|title=
(help)