Brennilis nuclear power plant is a retired nuclear power plant in Finistère, Brittany, France.

Project Details

Table 1: Unit-level project details for Brennilis nuclear power plant

Status Commissioning year Retirement year Nameplate capacity Reactor type Model Owner Operator
Retired[1] 1968[1] 1985[1] 75 MW[1] Heavy water gas-cooled reactor[1] MONTS-D'ARREE[1] Electricité De France (EDF)[1] Electricité De France (EDF)[1]

Table 2: Additional unit-level timeline details for Brennilis nuclear power plant

Construction start First criticality (more info) First grid connection Commercial operation Retirement date
July 1, 1962[1] December 23, 1966[1] July 9, 1967[1] June 1, 1968[1] July 31, 1985[1]

Table 3: Additional unit-level capacity details for Brennilis nuclear power plant

(Read more about nuclear capacity definitions.)

Reference net capacity Design net capacity Thermal capacity
70 MW[1] 70 MW[1] 250 MWt[1]

Location

Table 4: Unit-level location details for Brennilis nuclear power plant

Location Coordinates (WGS 84)
Finistère, Brittany, France[2] 48.3551, -3.8719 (exact)[2]

The map below shows the exact location of the nuclear power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Nuclear Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=217. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://goo.gl/maps/hoQAo55NoHjQhSN57. {{cite web}}: Missing or empty |title= (help)