Brigstock solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Brigstock solar farm is a solar farm under development in North Northamptonshire, East Midlands, England, United Kingdom.
Project Details
The solar farm has one phase that is at least 20 MW. (Read more about solar capacity ratings.)
Table 1: Phase-level project details for Brigstock solar farm
Status | Nameplate capacity | Owner |
---|---|---|
Development[1] | 50 MWp/dc[1] | ScottishPower Renewables; Buccleuch[1][2] |
Location
Table 2: Phase-level location details for Brigstock solar farm
Location | Coordinates (WGS 84) |
---|---|
North Northamptonshire, East Midlands, England, United Kingdom[1] | 52.4419, -0.6455 (exact)[1] |
The map below shows the exact location of the solar farm:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Renewable Energy Planning Database". United Kingdom Government. March, 2021. Retrieved May 24, 2021. Check date values in:
|date=
(help) - ↑ "Brigstock Solar Farm". Scottish Power Renewables. Archived from the original on October 15, 2021. Retrieved December 14, 2021.