| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
Broadwing Energy Center is a power station in pre-construction in Decatur, Illinois, United States. It is also known as Broadwing Clean Energy Complex.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Broadwing Energy Center | Decatur, Illinois, United States | 39.8754, -88.8993 (exact)[1][2] |
Unit-level coordinates (WGS 84):
- 1: 39.8754, -88.8993
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
|---|---|---|---|---|---|---|
| 1 | Pre-construction[1][3][4][5][6][7][2] | fossil gas: natural gas[2][8] | 400[7][2] | gas turbine[7][2] | yes[1][9] | 2029 (planned)[6][9][10][2] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Operator | Owner | Parent |
|---|---|---|---|
| 1 | Warwick Capital Partners[4] | Low Carbon Infrastructure [100%][8] | I Squared Capital |
Project-level captive use details
- Captive industry use (heat or power): both[9][7][4]
- Captive industry: Data Center, Other[9][7][4]
- Non-industry use: none[9][7][4]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Backgound
In October 2024, ADM and Broadwing Energy LLC (a subsidiary of Warwick Carbon Solutions) signed a formal agreement paving the way for the construction of the Broadwing Clean Energy Complex, a first-of-its-kind power and steam facility that will capture over 90% of CO2 emissions with a combination of CO2 removal technology and ADM’s permanent carbon storage wells. The plan calls for Warwick to build and operate a gas power plant that will provide both electricity and steam to ADM’s Decatur processing operations. The project is expected to begin operations in 2028-2029[11][12]
As of May 2025, there have not been any further updates about the project.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 https://journals.plos.org/plosone/article/file?type=supplementary&id=10.1371/journal.pone.0323817.s003.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20220803205430/http://www.powermag.com/8-rivers-unveils-560-mw-of-allam-cycle-gas-fired-projects-for-colorado-illinois/. Archived from the original on 2022-08-03.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20230513233929/https://www.catf.us/2023/02/time-now-biden-administration-must-adopt-strict-co2-emission-standards-power-sector/. Archived from the original on 2023-05-13.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20240604173022/https://carbonherald.com/warwick-carbon-solutions-announces-construction-of-unique-lower-emission-power-facility-in-decatur/. Archived from the original on 2024-06-04.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20221228014220/https://netpower.com/wp-content/uploads/2022/12/NPWR-PIPE-Presentation-12.14.22.pdf. Archived from the original (PDF) on 2022-12-28.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 (PDF) https://web.archive.org/web/20240604173201/https://www.adm.com/globalassets/sustainability/sustainability-reports/final_archer-daniels-midland-adm_2023-corporate-sustainability-report_51424.pdf. Archived from the original (PDF) on 2024-06-04.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 https://www.powermag.com/google-backs-first-u-s-gas-fired-power-plant-with-integrated-ccs-for-data-centers/.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 https://lowcarboninfra.com/about-us/.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 9.2 9.3 9.4 https://www.broadwingenergy.com/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://pulse2.com/google-working-with-i-squared-capital-and-to-develop-broadwing-energy/.
{{cite web}}: Missing or empty|title=(help) - ↑ "Warwick Carbon Solutions Announces Construction Of Unique Lower-Emission Power Facility In Decatur". Carbon Herald. Ocotber 7, 2023. Retrieved June 3, 2024.
{{cite web}}: Check date values in:|date=(help)CS1 maint: url-status (link) - ↑ "2023 Corporate Sustainability Report" (PDF). ADM. March 14, 2024. Retrieved June 3, 2024.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.
