Broadwing Energy Center
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Broadwing Energy Center is a power station in pre-construction in Decatur, Illinois, United States. It is also known as Broadwing Clean Energy Complex.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Broadwing Energy Center | Decatur, Illinois, United States | 39.8754, -88.8993 (exact)[1][2] |
Unit-level coordinates (WGS 84):
- 1: 39.8754, -88.8993
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Pre-construction[1][3][4][5][6][2] | fossil gas: natural gas[2] | 280[2] | AFC[2] | yes[1][7] | 2028 (planned)[6][2] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Operator | Owner | Parent |
---|---|---|---|
1 | Warwick Capital Partners[3] | Archer-Daniels-Midland Co; 8 Rivers Capital LLC; Warwick Capital Partners LLP[2][8][2][8][2][8] | 8 Rivers Capital LLC; Archer-Daniels-Midland Co; Warwick Capital Partners LLP |
Project-level captive use details
- Captive industry use (heat or power): both[7][3]
- Captive industry: Other[7][3]
- Non-industry use: none[7][3]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Backgound
In October 2024, ADM and Broadwing Energy LLC (a subsidiary of Warwick Carbon Solutions) signed a formal agreement paving the way for the construction of the Broadwing Clean Energy Complex, a first-of-its-kind power and steam facility that will capture over 90% of CO2 emissions with a combination of CO2 removal technology and ADM’s permanent carbon storage wells. The plan calls for Warwick to build and operate a gas power plant that will provide both electricity and steam to ADM’s Decatur processing operations. The project is expected to begin operations in 2028-2029[9][10]
As of May 2025, there have not been any further updates about the project.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 https://journals.plos.org/plosone/article/file?type=supplementary&id=10.1371/journal.pone.0323817.s003.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://web.archive.org/web/20220803205430/http://www.powermag.com/8-rivers-unveils-560-mw-of-allam-cycle-gas-fired-projects-for-colorado-illinois/. Archived from the original on 2022-08-03.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20240604173022/https://carbonherald.com/warwick-carbon-solutions-announces-construction-of-unique-lower-emission-power-facility-in-decatur/. Archived from the original on 2024-06-04.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230513233929/https://www.catf.us/2023/02/time-now-biden-administration-must-adopt-strict-co2-emission-standards-power-sector/. Archived from the original on 2023-05-13.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20221228014220/https://netpower.com/wp-content/uploads/2022/12/NPWR-PIPE-Presentation-12.14.22.pdf. Archived from the original (PDF) on 2022-12-28.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 (PDF) https://web.archive.org/web/20240604173201/https://www.adm.com/globalassets/sustainability/sustainability-reports/final_archer-daniels-midland-adm_2023-corporate-sustainability-report_51424.pdf. Archived from the original (PDF) on 2024-06-04.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 https://www.broadwingenergy.com/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 https://electricenergyonline.com/article/energy/category/generation/52/893220/8-rivers-capital-adm-announce-intention-to-make-illinois-home-to-game-changing-zero-emissions-project.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Warwick Carbon Solutions Announces Construction Of Unique Lower-Emission Power Facility In Decatur". Carbon Herald. Ocotber 7, 2023. Retrieved June 3, 2024.
{{cite web}}
: Check date values in:|date=
(help)CS1 maint: url-status (link) - ↑ "2023 Corporate Sustainability Report" (PDF). ADM. March 14, 2024. Retrieved June 3, 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.