Brochloch Rig wind farm
From Global Energy Monitor
| This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Brochloch Rig wind farm, Windy Standard 1 Wind Farm repower (Phase RP1), Windy Standard III Wind Farm (Brockloch Rig Phase 2) (Phase 2), Windy Standard 1 Wind Farm (Phase 1), Brockloch Rig wind farm, Windy Standard III wind farm (Phase 2)
Brochloch Rig wind farm is an operating wind farm in Dumfries and Galloway, Scotland, United Kingdom.
Project Details
Table 1: Phase-level project details for Brochloch Rig wind farm
| Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
|---|---|---|---|---|---|---|
| 1 | Operating[1] | 1996[2] | 22 MW[1] | Onshore[1] | RWE NPower Renewables Ltd; Fred Olsen Renewables AB[3] | Brockloch Rig III[4] |
| 2 | Operating[5] | 2017[5] | 90 MW[5] | Onshore[5] | Fred Olsen Renewables AB [100%][5] | Brockloch Rig III[4] |
| 3 | Construction[5] | – | 87.6 MW[5] | Onshore[5] | Fred Olsen Renewables AB [100%][5] | Brockloch Rig III[4] |
| RP1 | Pre-construction[5] | –[6] | 49.6 MW[5] | Onshore[1] | RWE NPower Renewables Ltd; Fred Olsen Renewables AB[3] | Brockloch Rig III[4] |
Location
Table 2: Phase-level location details for Brochloch Rig wind farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Dumfries and Galloway, Scotland, Scotland, United Kingdom[5] | 55.2971, -4.1829 (exact)[5] |
| 2 | Dumfries and Galloway, Scotland, Scotland, United Kingdom[5] | 55.2922, -4.2031 (exact)[5] |
| 3 | Dumfries and Galloway, Scotland, Scotland, United Kingdom[5] | 55.2764, -4.2417 (exact)[5] |
| RP1 | Dumfries and Galloway, Scotland, Scotland, United Kingdom[5] | 55.2764, -4.2417 (exact)[5] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240126061015/https://fredolsenrenewables.com/windfarm-collection/united-kingdom/brockloch-rig-wind-farm/. Archived from the original on 2024-01-26.
{{cite web}}: Missing or empty|title=(help) - ↑ https://fredolsenrenewables.com/windfarm-collection/united-kingdom/brockloch-rig-wind-farm/ https://www.gov.uk/government/publications/renewable-energy-planning-database-monthly-extract, https://fredolsenrenewables.com/windfarm-collection/united-kingdom/brockloch-rig-wind-farm/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 3.0 3.1 https://fredolsenrenewables.com/windfarm-collection/united-kingdom/brockloch-rig-wind-farm/ https://fredolsenrenewables.com/windfarm-collection/united-kingdom/brockloch-rig-wind-farm/, https://fredolsenrenewables.com/windfarm-collection/united-kingdom/brockloch-rig-wind-farm/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240131080643/https://fredolsenrenewables.com/windfarm-collection/united-kingdom/windy-standard-iii/. Archived from the original on 2024-01-31.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 "Renewable Energy Planning Database: quarterly extract". 2024-01. Archived from the original on 2024-03-27. Retrieved 2024-02-27.
{{cite web}}: Check date values in:|date=(help) - ↑ https://web.archive.org/web/20240126151318/https://fredolsenrenewables.com/windfarm-collection/united-kingdom/brockloch-rig-i/. Archived from the original on 2024-01-26.
{{cite web}}: Missing or empty|title=(help)
