Bucharest-Vest power station

From Global Energy Monitor
Part of the Global Gas Plant Tracker, a Global Energy Monitor and Center for Media and Democracy project.

Bucharest-Vest power station is a 386-megawatt (MW) gas-fired power plant in Bucuresti County, Romania.

Location

The map below shows the location of the power station in Bucharest, Bucuresti County, Romania.

Loading map...

Project Details

  • Sponsor: Electrocentrale Bucureşti SA[1]
  • Parent company:
  • Location: Bucharest, Bucuresti County, Romania
  • Coordinates: 44.4058, 26.1557 (exact)[2]
  • Gross generating capacity (operating): 386 MW
    • Unit 1: Gas-fired[3] steam turbine[4] with CHP[4], 125 MW[1] (start-up in 1975)[4]
    • Unit 2: Gas-fired[5] steam turbine[4] with CHP[4], 125 MW[1] (start-up in 1975)[4]
    • Unit 3: Gas-fired[6] combined cycle[4] with CHP[4], 136 MW[1] (start-up in 2009)[4]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 Elcen, accessed December 2019
  2. Carbon Monitoring for Action (CARMA) database, ID 6077 version 2 (2009) csv file obtained from FRESNA
  3. ENTSO-E Transparency Platform, ID 30WELCEBUCV1---6 accessed November 2019
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 World Electric Power Plants database S&P Global Platts, June 2019
  5. ENTSO-E Transparency Platform, ID 30WELCEBUCV2---1 accessed November 2019
  6. ENTSO-E Transparency Platform, ID 30WELCEBUCV3---X accessed November 2019