Buffalo Atlee wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Buffalo Atlee wind farm is a wind farm under construction in Special Area No. 2, Alberta, Canada.
Project Details
Table 1: Phase-level project details for Buffalo Atlee wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Mount type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Construction[1] | 2022 (planned)[2] | 16[3] | Onshore | Sawridge First Nation; Capstone Infrastructure CORP[3] | Capstone Infrastructure CORP[3] |
2 | Construction[2] | 2022 (planned)[4] | 16[3] | Onshore | Sawridge First Nation; Capstone Infrastructure CORP[3] | Capstone Infrastructure CORP[3] |
3 | Construction[4] | 2022 (planned)[5] | 16[3] | Onshore | Sawridge First Nation; Capstone Infrastructure CORP[3] | Capstone Infrastructure CORP[3] |
4 | Construction[5] | 2022 (planned)[1] | 10[6] | Onshore | Sawridge First Nation; Capstone Infrastructure CORP[3] | Capstone Infrastructure CORP[3] |
Location
Table 2: Phase-level location details for Buffalo Atlee wind farm
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Special Area No. 2, Alberta, Canada[1] | 50.7397, -111.0387 (exact)[1] |
2 | Special Area No. 3, Alberta, Canada[2] | 50.7397, -111.0387 (exact)[2] |
3 | Special Area No. 4, Alberta, Canada[4] | 50.7397, -111.0387 (exact)[4] |
4 | Special Area No. 5, Alberta, Canada[5] | 50.7397, -111.0387 (exact)[5] |
The map below shows the exact location of the wind farm phases:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 "Buffalo Atlee Wind Project (Phase 1 - 4)". Majorprojects.Alberta.Ca. Archived from the original on November 19, 2021. Retrieved November 29, 2021.
- ↑ 2.0 2.1 2.2 2.3 "Buffalo Atlee Wind Project (Phase 1 - 4)". Majorprojects.Alberta.Ca. Archived from the original on November 19, 2021. Retrieved November 29, 2021.
- ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 "In Development". Capstone Infrastructure. Archived from the original on January 16, 2021. Retrieved November 29, 2021.
- ↑ 4.0 4.1 4.2 4.3 "Buffalo Atlee Wind Project (Phase 1 - 4)". Majorprojects.Alberta.Ca. Archived from the original on November 19, 2021. Retrieved November 29, 2021.
- ↑ 5.0 5.1 5.2 5.3 "Buffalo Atlee Wind Project (Phase 1 - 4)". Majorprojects.Alberta.Ca. Archived from the original on November 19, 2021. Retrieved November 29, 2021.
- ↑ (PDF) https://buffaloatlee.com/BuffaloAtlee/Assets/Documents/BA4_Winter2021_Newsletter_vf.pdf. Archived (PDF) from the original on November 25, 2021.
{{cite web}}
: Missing or empty|title=
(help)