Buffalo Trail Wind Project
From Global Energy Monitor
| This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Buffalo Trail Wind Project is an announced wind farm in Alberta, Canada.
Project Details
Table 1: Phase-level project details for Buffalo Trail Wind Project
| Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner |
|---|---|---|---|---|---|
| North | Announced[1] | 2028 (planned)[2] | 200 MW[1] | Onshore[1] | ENGIE SA[1] |
| South | Announced[1] | – | 200 MW[1] | Onshore[1] | ENGIE SA[1] |
Location
Table 2: Phase-level location details for Buffalo Trail Wind Project
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| North | Alberta, Canada[3] | 49.8424, -110.3258 (approximate)[3] |
| South | Alberta, Canada[3] | 49.8424, -110.3258 (approximate)[3] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://www.auc.ab.ca/featured/buffalo-trail-wind-power-project/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.power-technology.com/marketdata/power-plant-profile-buffalo-trail-north-wind-farm-canada/.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 https://www.auc.ab.ca/featured/buffalo-trail-wind-power-project/ https://majorprojects.alberta.ca/details/Buffalo-Trail-North-Wind-Project/11122, https://www.auc.ab.ca/featured/buffalo-trail-wind-power-project/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help)
