Bukhara Teploenergo 3 power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Bukhara Teploenergo 3 power station (котельная №-3 предприятия «Теплоэнерго» г.Бухары) is a power station in pre-construction in Bukhara, Uzbekistan. It is also known as 3-boiler plant of the Teploenergo enterprise in Bukhara.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Bukhara Teploenergo 3 power station | Bukhara, Bukhara, Bukhara, Uzbekistan | 39.743978, 64.411911 (exact)[1] |
Unit-level coordinates (WGS 84):
- 1, 2: 39.743978, 64.411911
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP |
---|---|---|---|---|---|
1 | Pre-construction[2][3][4][5] | fossil gas: natural gas[6] | 54[6] | gas turbine[6] | yes[6] |
2 | Pre-construction[2][3][4][5] | fossil gas: natural gas[6] | 54[6] | gas turbine[6] | yes[6] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Thermal Power Plants Holding Co[6][7] | Thermal Power Plants Holding Co |
2 | Thermal Power Plants Holding Co[6][7] | Thermal Power Plants Holding Co |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
In May 2023, an agreement was signed between JSC Thermal Power Stations and Siemens Energy for installation of two gas turbines, 54 MW each, at the power station.[8] The turbines were expected to be delivered and installed in 2023 and commissioned in December 2023.[9] The National Bank for Foreign Economic Activity of the Republic of Uzbekistan (NBU) provided financing for the project in 2023.[10]
In September 2024, construction of combined-cycle plants by Siemens Energy in Uzbekistan was highlighted as a key initiative in discussions between President Shavkat Mirziyoyev and Germany's Chancellor Olaf Scholz, although no specific reference was made to the Bukhara Teploenergo 3 power station.[11] As of April 2025, no new updates on the project's status have been released.
Articles and Resources
References
- ↑ https://www.google.com/maps/place/Kotel'naya+Rk-3/@39.7437758,64.4093365,17z/data=!4m14!1m7!3m6!1s0x3f500710b5243333:0x29f47d8229fb79f7!2sKotel'naya+Rk-3!8m2!3d39.7437717!4d64.4119114!16s%2Fg%2F11pr3_thcy!3m5!1s0x3f500710b5243333:0x29f47d8229fb79f7!8m2!3d39.7437717!4d64.4119114!16s%2Fg%2F11pr3_thcy?entry=ttu.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://president.uz/en/lists/view/7546.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://neftegaz.ru/news/energy/778894-siemens-i-uzbekistan-zaklyuchili-soglasheniya-v-sfere-energetiki-na-72-mln-evro/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://nbu.uz/articles-about-activities/itogi-deyatelnosti-ao-uznatsbank-za-2023-god/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 "Siemens to build two TPPs in Uzbekistan". Kun.uz. Archived from the original on 2024-04-04. Retrieved 2024-03-29.
- ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 https://web.archive.org/web/20240120032332/http://www.uzdaily.com/en/post/80743. Archived from the original on 2024-01-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://minenergy.uz/ru/news/view/2790.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Siemens и Узбекистан заключили соглашения в сфере энергетики на 72 млн евро". neftegaz.ru. May 5, 2023. Retrieved March 29, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Siemens to build two TPPs in Uzbekistan". kun.uz. May 3, 2023. Retrieved March 29, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Итоги деятельности АО "Узнацбанк" за 2023 год". NDU. April 1, 2024. Retrieved November 14, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "President of Uzbekistan and Federal Chancellor of Germany Discuss Further Expansion of Multifaceted Cooperation". president.uz. September 15, 2024. Retrieved November 14, 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.