Burbo Bank wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Burbo Bank Extension (Phase 2), Burbo Bank 2 (Phase 2), Burbo Bank Extension offshore wind farm (Phase 2)

Burbo Bank wind farm is an operating wind farm in England, United Kingdom.

Project Details

Table 1: Phase-level project details for Burbo Bank wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2007[1] 90 MW[1] Offshore hard mount[1] Ørsted A/S [100%][2] Ørsted[1]
2 Operating[1] 2017[1] 258 MW[1] Offshore hard mount[1] – Ørsted[1]

Location

Table 2: Phase-level location details for Burbo Bank wind farm

Phase Name Location Coordinates (WGS 84)
1 England, United Kingdom[1] 53.4882, -3.1849 (exact)[1]
2 England, United Kingdom[1] 53.4800, -3.2700 (exact)[1]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 "Renewable Energy Planning Database: quarterly extract". 2024-01. Archived from the original on 2024-03-27. Retrieved 2024-02-27. {{cite web}}: Check date values in: |date= (help)
  2. ↑ (PDF) https://web.archive.org/web/20240126061521/https://www.thecrownestate.co.uk/media/3954/offshore-wind-project-listing.pdf. Archived from the original (PDF) on 2024-01-26. {{cite web}}: Missing or empty |title= (help)