Bustelo (Greenalia) wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Greenalia Bustelo
Bustelo (Greenalia) wind farm is a wind farm under construction in Carballo, Galicia, Spain.
Project Details
Table 1: Phase-level project details for Bustelo (Greenalia) wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
Construction[1] | 2023 (planned)[1] | 45 MW[2] | Onshore[2] | Greenalia[2] | Greenalia Wind Power Bustelo SLU[3] |
Location
Table 2: Phase-level location details for Bustelo (Greenalia) wind farm
Location | Coordinates (WGS 84) |
---|---|
Carballo, Galicia, Spain[2] | 43.4601, -7.7901 (approximate)[4] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.energyglobal.com/wind/31052022/siemens-gamesa-and-greenalia-install-three-wind-farms-in-spain/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://www.greenalia.es/greenalia-obtains-the-administrative-licence-for-the-construction-of-45-mw-bustelo-wind-farm/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.xunta.gal/dog/Publicados/2021/20210726/AnuncioG0596-020721-0004_es.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.thewindpower.net/windfarm_en_28633.php.
{{cite web}}
: Missing or empty|title=
(help)